Webster method

In this method, cycle time is calculated for least total delay at the intersection.

Optimum cycle time C0=1.5L+51−Y

L = total loss in 1 cycle:

L=ntL+R
tL
Startup loss in each phase ≈ 2 sec.
n
Number of phases.
R
Total all-red time.
Y=y1+y2+⋯+yn y1=q1S1,   y2=q2S2,  …

q = critical lane volume, S = saturation volume.

Green splitting

Gi=yi∑y(C0−L)=yiY(C−L)

Saturation flow vs. road width

Width (m)Saturation flow (PCU/hr)
31850
3.51890
41950
4.52250
52350
5.52990
>5.5525 / m width
Worked example

At an intersection of two roads: qA = 400 PCU/hr, SA = 1250 PCU/hr; qB = 250 PCU/hr, SB = 1000 PCU/hr. All-red time = 12 sec (pedestrian). Design a two-phase signal by Webster's method.

Y=4001250+2501000=0.57 L=ntL+R=2×2+12=16 sec C0=1.5×16+51−0.57=67.44≈68 sec
G1=400/12500.57(51.44)=28.87≈29 sec G2=250/10000.57(51.44)=22.56≈23 sec

Provide amber time 2 sec in each phase: G₁ + G₂ + all-red + A₁ + A₂ = 68 ⇒ 29 + 23 + 12 + A₁ + A₂ = 68 ⇒ A₁ = A₂ = 2 sec.

PhaseGY
1292
2232

Cycle = 68 sec, split across G₁, A₁, the 12 sec all-red clearance, G₂, A₂ in sequence.

IRC method

The IRC method decides the signal timing by the approximate method, and the design is then checked.

Check for minimum clearance time

A minimum green time is required for clearing the vehicles arriving during the cycle for each lane of the approach road. Assume the 1st vehicle takes 6 sec and the rest take 2 sec each to clear.

If the critical lane volume per lane on road 1 is n₁ veh/hr/lane, the number of vehicles accumulated in one cycle:

x1=n1no. of cycles,   no. of cycles=3600C x1=n13600×C,   x2=n2C3600 G1(mean)=6+(x1−1)×2 G2(mean)=6+(x2−1)×2

The minimum green time for vehicular traffic is 16 sec.

Check for optimum cycle time

C0=1.5L+51−Y L=ntL+R,   R=total amber time L=4n+total amber time

(4 sec = lost time taken by the 1st vehicle, used here as tL.)

G R G amber time

The trailing hatched sliver of each phase is the amber time counted toward total lost time L.

This cycle time should be sufficient for both vehicles and pedestrians. If both conditions are satisfied, the calculated cycle time is correct; otherwise, modifications should be made as required.

Worked example — design signal as per IRC method
Road ARoad B
Road width (m)197.5
No. of lanes62
Traffic, one direction (veh/hr)1360310
Traffic, other direction (veh/hr)1230290
Amber time (sec)66
Saturation volume (veh/hr/lane)16621920

Per-lane critical volumes: nA = 1360/3 = 453.33 veh/hr/lane, nB = 310 veh/hr/lane.

UPA=WA1.2+7=22.83 sec UPB=WB1.2+7=13.25 sec

From UPA = RA = GB + YB: 22.83 = GB + 6 ⇒ GB = 16.83 sec.
From UPB = RB = GA + YA: 13.25 = GA + 6 ⇒ GA = 7.25 sec.

GA/GB = 0.43, but nA/nB = 1.46 — increase GA:

GA′=(nAnB)GB=24.61 sec

Cycle length = GA′ + GB + YA + YB = 24.61 + 16.83 + 6 + 6 = 53.44 sec ⇒ adopt C = 55 sec (multiple of 5).

Ceff=55−12=43 sec GA=nAnA+nB×43=25.53≈26 sec GB=17.46≈17 sec
PhaseGYR
A26623
B17632

Check for minimum green time — no. of cycles = 3600/55 = 65.45.

xA=453.3365.45=6.92≈7 veh/cycle xB=31065.45=4.73≈5 veh/cycle GA=6+6×2=18 sec < 26 sec — OK GB=6+4×2=14 sec < 17 sec — OK

Optimization of cycle time

L=ntL+R=2×4+(6+6)=20 sec Y=453.331662+3101920=0.272+0.161=0.433 C0=1.5×20+51−0.433=68.82 sec
⚠
Source arithmetic slip

The source's own numbers give C₀ = (1.5×20+5)/(1−0.433) = 35/0.567 ≈ 61.7 sec, not the 68.82 sec written in the handwritten note. Reproduced here as written in the source — flagged for Kishan to double-check page 24.

The vehicular requirement is failed (C₀ > adopted C = 55 sec) — hence increase the signal time. Adopt cycle time = 65 sec.

Ceff=65−12=53 sec GA=453.33453.33+310×53=31.47≈32 sec GB=21.52≈21 sec
✎
Self-corrected in source

The student's own table using this Ceff = 53 sec basis (32|6|27 top, 38|21|6 bottom) is crossed out and marked “wrong” in the original — the correct green split must instead use Gi = (yi/Y)(C₀−L), shown below.

GA=y1Y(C0−L)=0.2720.433(65−20)=28.3≈28 sec GB=y2Y(C0−L)=17 sec
RA=GB+YB+tLB=17+6+4=27 sec RB=GA+YA+tLA=28+6+4=38 sec

RA(vehicular) > RA(pedestrian) — OK. RB(vehicular) > RB(pedestrian) — OK.

GA = 28 + 4 = 32 sec, GB = 17 + 4 = 21 sec, AA = 6 sec, AB = 6 sec.