Transportation Engineering / Traffic Engineering
In this method, cycle time is calculated for least total delay at the intersection.
L = total loss in 1 cycle:
q = critical lane volume, S = saturation volume.
| Width (m) | Saturation flow (PCU/hr) |
|---|---|
| 3 | 1850 |
| 3.5 | 1890 |
| 4 | 1950 |
| 4.5 | 2250 |
| 5 | 2350 |
| 5.5 | 2990 |
| >5.5 | 525 / m width |
At an intersection of two roads: qA = 400 PCU/hr, SA = 1250 PCU/hr; qB = 250 PCU/hr, SB = 1000 PCU/hr. All-red time = 12 sec (pedestrian). Design a two-phase signal by Webster's method.
Provide amber time 2 sec in each phase: G₁ + G₂ + all-red + A₁ + A₂ = 68 ⇒ 29 + 23 + 12 + A₁ + A₂ = 68 ⇒ A₁ = A₂ = 2 sec.
| Phase | G | Y |
|---|---|---|
| 1 | 29 | 2 |
| 2 | 23 | 2 |
Cycle = 68 sec, split across G₁, A₁, the 12 sec all-red clearance, G₂, A₂ in sequence.
The IRC method decides the signal timing by the approximate method, and the design is then checked.
A minimum green time is required for clearing the vehicles arriving during the cycle for each lane of the approach road. Assume the 1st vehicle takes 6 sec and the rest take 2 sec each to clear.
If the critical lane volume per lane on road 1 is n₁ veh/hr/lane, the number of vehicles accumulated in one cycle:
The minimum green time for vehicular traffic is 16 sec.
(4 sec = lost time taken by the 1st vehicle, used here as tL.)
The trailing hatched sliver of each phase is the amber time counted toward total lost time L.
This cycle time should be sufficient for both vehicles and pedestrians. If both conditions are satisfied, the calculated cycle time is correct; otherwise, modifications should be made as required.
| Road A | Road B | |
|---|---|---|
| Road width (m) | 19 | 7.5 |
| No. of lanes | 6 | 2 |
| Traffic, one direction (veh/hr) | 1360 | 310 |
| Traffic, other direction (veh/hr) | 1230 | 290 |
| Amber time (sec) | 6 | 6 |
| Saturation volume (veh/hr/lane) | 1662 | 1920 |
Per-lane critical volumes: nA = 1360/3 = 453.33 veh/hr/lane, nB = 310 veh/hr/lane.
From UPA = RA = GB + YB: 22.83 = GB + 6 ⇒ GB = 16.83 sec.
From UPB = RB = GA + YA: 13.25 = GA + 6 ⇒ GA = 7.25 sec.
GA/GB = 0.43, but nA/nB = 1.46 — increase GA:
Cycle length = GA′ + GB + YA + YB = 24.61 + 16.83 + 6 + 6 = 53.44 sec ⇒ adopt C = 55 sec (multiple of 5).
| Phase | G | Y | R |
|---|---|---|---|
| A | 26 | 6 | 23 |
| B | 17 | 6 | 32 |
Check for minimum green time — no. of cycles = 3600/55 = 65.45.
Optimization of cycle time
The source's own numbers give C₀ = (1.5×20+5)/(1−0.433) = 35/0.567 ≈ 61.7 sec, not the 68.82 sec written in the handwritten note. Reproduced here as written in the source — flagged for Kishan to double-check page 24.
The vehicular requirement is failed (C₀ > adopted C = 55 sec) — hence increase the signal time. Adopt cycle time = 65 sec.
The student's own table using this Ceff = 53 sec basis (32|6|27 top, 38|21|6 bottom) is crossed out and marked “wrong” in the original — the correct green split must instead use Gi = (yi/Y)(C₀−L), shown below.
RA(vehicular) > RA(pedestrian) — OK. RB(vehicular) > RB(pedestrian) — OK.
GA = 28 + 4 = 32 sec, GB = 17 + 4 = 21 sec, AA = 6 sec, AB = 6 sec.