Transportation Engineering / Traffic Engineering
The approximate method is based on the pedestrian crossing requirement. Pedestrian crossing can be taken care of in two ways:
Option 1: pedestrians cross during the existing all-red clearance at the tail of the phase — no separate phase added.
Option 2: an exclusive pedestrian phase of duration UP₁, sized to the road width w₁ being crossed.
wi = width of road; 1.2 m/s = speed of pedestrian (crossing time term); 7 sec = margin / walk period.
| Phase 1 | ||
|---|---|---|
| G₁ | Y₁ | R₁ → R₁ = UP₁ |
| Phase 2 | ||
| R₂ | G₂ | Y₂ |
But the green time should also account for vehicular movement. If n₁ and n₂ are the approach volumes of the heaviest traffic per hour per lane for roads 1 and 2 respectively:
If G₁/G₂ < n₁/n₂, increase G₁:
If G₁/G₂ > n₁/n₂, increase G₂ instead:
Road A: width 21 m, highest volume 350 veh/hr/lane, amber time 5 sec. Road B: width 15 m, highest volume 260 veh/hr/lane, amber time 5 sec. Design the signal by the approximate method.
UPA/UPB = 1.256, while nA/nB = 1.346 — the two ratios don't match, so UPA needs to increase.
Using the phase relations: UPA = RA = GB + YB ⇒ 24.5 = GB + 5 ⇒ GB = 19.5 sec.
UPB = RB = GA + YA ⇒ GA = 14.5 sec.
GA/GB = 0.743, while nA/nB = 1.346 — increase GA:
GA′ = 26.25 sec (new green time)
C = 60 sec, Ceff = 60 − 10 = 50 sec.
| Vehicular | G | Y | R |
|---|---|---|---|
| A | 29 | 5 | 26 |
| B | 34 | 21 | 5 |
| Pedestrian | Clearance | Walk | |
|---|---|---|---|
| A | 34 | 17.5 | 8.5 |
| B | 12.5 | 21.5 | 26 |
(Pedestrian row values read as crossing/clearance then walk period, matching the vehicular RPB/UPB and RPA/UPA slots against the traffic phase table above.)