Green splitting

Green splitting is the proportioning of effective green time among each of the signal phases.

Ceff=C−ntL gi=(Vi∑Vi)Ceff g1V1=g2V2=CeffV1+V2

Once gi is found, the green display time Gi follows from:

gi=Gi+Yi−tL

gi found from the split above; Yi, tL are given — hence Gi can be found.

Worked example

Phase 1: V₁ = 1000, tL1 = 2.5 sec, Y₁ = 3 sec. Phase 2: V₂ = 600, tL2 = 3.5 sec, Y₂ = 4 sec. Cycle length = 120 sec. Allocate green time to each phase.

Green time(Ceff)=120−(2.5+3.5)=114 sec g1=10001600(114)=71.25 sec g2=6001600(114)=42.75 sec G1=71.25+2.5−3=70.75→71 sec G2=42.75+3.5−4=42.25→42 sec
120 2.5 71 3 R R 42 4 3.5

Final 120-second cycle split: phase 1 gets 2.5 | 71 | 3, phase 2 gets 3.5 | 42 | 4 (loss | green | amber, seconds).

Delay at a signalized approach

cumulative no. of vehicles t R G approaching (headway 4 sec) departing (headway 2 sec)

During red, vehicles arrive (steady approaching line, headway 4 sec) but none depart. Once green starts, they discharge in a stepped queue (departing headway 2 sec) until the queue clears. The shaded area between the two curves is total delay.

Total delay=Area of the diagram avg delay=Total delayno. of vehicles=Area of diagramno. of vehicles

If the green time provided is more than required, the approaching and departing lines meet before green ends — once they cross, arriving vehicles depart immediately and delay = 0.

P A G

Once approaching and departing curves converge, delay stops accumulating; A = area of the residual delay triangle, P = peak cumulative count.

avg delay=areaP=AP

Various methods of signal design

  1. Trial cycle method
  2. Approximate method
  3. Webster method
  4. IRC method

Trial cycle method

A 15-minute count of traffic (nA and nB on road A and B) is noted during the design peak-hour flow. Assume cycle time = C.

15 min A nA B nB nos. of vehicles on one cycle from road A (x₳)

Vehicles arriving per signal cycle on roads A and B during the 15-minute peak count.

no. of cycles=15×60C xA=nAno. of cycles=nA⋅C15×60 xB=nBno. of cycles=nB⋅C15×60

Average time required for one vehicle to cross the intersection = 2.5 sec (average headway).

GA=xA×2.5 GB=xB×2.5

Amber times AA and AB are given.

Calculated cycle time C′=(GA+AA)+(GB+AB)

If C ≠ C′, repeat the iteration with a different assumed value of C.

Worked example

A 15-min traffic count on roads 1 & 2 during peak hour is 178 and 142 veh/lane respectively. Amber time AA = 3 sec, AB = 2 sec. Design the signal timing by trial cycle method, assuming average headway of 2.5 sec.

Try C = 60 sec: no. of cycles = (15×60)/60 = 15.

xA=17815=11.867⇒GA=29.67 sec xB=14215=9.467⇒GB=23.67 sec Cycle time=29.67+23.67+3+2=58.33 sec≠assumed 60

Try C = 45 sec: no. of cycles = (15×60)/45 = 20.

xA=17820=8.9⇒GA=22.25 sec xB=14220=7.1⇒GB=17.75 sec

C = 45 sec = assumed C ⇒ correct cycle time = 45 sec.

In closed form, with cycle length = C, no. of cycles = (15×60)/C:

xA=178×C15×60,   GA=2.5×178×C15×60 xB=142×C15×60,   GB=2.5×142×C15×60 GA+GB+AA+AB=C

C = 45 sec

Note — Peak Hour Factor (PHF)

PHF=avg traffic flow in 1 hrmax traffic volume in a 15-min interval (hourly rate)
Case15-min countsHourly totalPeak 15-min ×4PHF
1200, 150, 400, 250100016000.625
2250, 250, 250, 250100010001
30, 0, 1000, 0100040000.25

PHF ∈ (0.25, 1)