Transportation Engineering / Traffic Engineering

TRANS-06B Cycle Length Determination and Saturation Volume

Converted from handwritten notes — TRANSPORT 06.pdf, pages 4–9

Doc No.TRANS-06B
StatusDraft — Awaiting Review
Converted08-08-2026
Approved—

Time required to clear N vehicles

T=N⋅h+l
N
Number of vehicles.
h
Saturation headway (head time).
l
Startup loss.
headway veh. 1 2 3 4 5 6 7 h Vehicle in row

Headway of successive vehicles in the queue shrinks after the first few vehicles and settles to the saturation headway h.

Determination of cycle length

tₗ₁ G Y R R G Y tₗ₂

Each phase carries its own lost time (tₗ₁, tₗ₂, …) — the startup + all-red slivers not usable by either approach.

Total lost time in one cycle Total lost time=∑i=1ntLi

n = number of phases.

If cycle length = C, total number of cycles in 1 hour = 3600/C.

Total loss time=(∑1ntLi)⋅3600C

If Σtₗ₁ = tₗ (same for all cycles):

Total loss time=ntL⋅3600C

Remaining time available to clear vehicles in 1 hr:

Tg=3600−ntL⋅3600C Tg=3600(1−ntLC)

Let h = saturation headway time (sec). Then the maximum (critical) saturation volume that can be served:

Vc=Tgh Vc=3600h(1−ntLC)

3600/h = S → saturation volume, so:

Vc=S(1−ntLC) VcS=1−ntLC ntLC=1−VcS
Cycle length C=ntL(1−VcS)
C
Cycle length.
tₗ
Startup time loss in each phase (sec).
n
Number of phases.
Vc
Maximum sum of critical volumes (veh/hr).
S
Saturation volume (veh/hr).

Generalizing over all critical movements:

C=ntL1−∑1nViSi

Worked example — two-phase intersection

Calculate cycle time for the intersection shown. Assume startup loss in 1 phase = 5 sec, number of phases = 2.

700 (1800) 400 (1500) 500 (1500) 600 (1600) A

4-leg intersection A — approach volume (saturation volume) veh/hr shown per leg; the critical (heaviest) movement on each phase is taken forward.

Critical values used: VA = 500 (maxm at signal time), VB = 700, SA = 1500, SB = 1800.

C=ntL1−(ViSi)=2×51−(5001500+7001800)

C = 36 sec

Worked example — four-phase intersection

2 1 3 4

Four movements numbered 1–4 at the intersection, each treated as its own phase.

V₁ = 300, V₂ = 400, V₃ = 350, V₄ = 410, S = 2000 (common saturation volume for all approaches), tₗ = 4 sec, n = 4.

C=4×41−300+400+350+4102000

C = 59.25 sec

For the same intersection with the opposite (return) turning movements taken as critical: V₁ = 270, V₂ = 400, V₃ = 410, V₄ = 350.

C = 56.44 sec

C G₁ Y₁ R₁ 1 R₂ G₂ Y₂ R₂ 2 R₃ G₃ Y₃ R₃ 3 R₄ G₄ Y₄ 4

Four-phase signal timing diagram — each row's green window is staggered so no two conflicting phases run together.

Saturation volume and lane splitting

A 4-leg intersection has movements 1–4 with saturation headway 2.3 sec (S = 3600/2.3 ≈ 1565 veh/hr/lane), lost time = 3 sec, two-phase signal. Volumes: V₁ = 1150, V₂ = 1300, V₃ = 1800, V₄ = 900 veh/hr.

∑iViSi=18001565+11501565>1

Since ΣVi/Si exceeds 1, the traffic needs to be split across more lanes — the number of lanes on the approach must be increased.

Splitting 1800 into two lanes of 900 each and 1150 into two lanes of 650 (with the cross movement of 900 kept as is): V₁ = 900, V₂ = 1150.

∑iViSi=9001565+11501565>1

Still > 1 — increase the number of lanes again. Splitting 1150 into two lanes of 575: V₁ = 900, V₂ = 575.

∑iViSi=0.942 C=ntL1−∑iViSi=104.33 sec

Re-checking with the other pair of critical movements after splitting, V₁ = 650, V₂ = 575, n tₗ = 6 sec:

C=61−650+5751565

C = 27.6 sec