Transportation Engineering / Traffic Engineering
Traffic signals are part of active control at an intersection — the right-of-way is assigned to conflicting streams of traffic by a timed sequence of coloured indications, rather than left to the drivers' own judgement (as in passive control).
Two-phase signal: while approach A shows Green → Yellow → Red, approach B is held on Red, then gets its own Green → Yellow. The overlap after each Yellow (before the next Green starts) is the all-red clearance time.
A signal cycle is one complete rotation through all the indications provided at the intersection.
An interval indicates the change from one indication to another. Intervals are classified as:
There are two types of amber time:
Normal amber is provided after the green interval. It is provided for the following reasons:
Red amber is the hatched sliver just before B's green starts (and, symmetrically, before A's next green). It informs the driver of the upcoming green — but no vehicular movement is allowed during it, so it is counted only as part of the red time.
Red amber is provided to inform the driver about the beginning of green time. It is considered part of the red time only, because vehicular movement is not allowed during it — while calculating, we do not consider red amber separately.
Loss time indicates the time during which the intersection is not effectively utilized for any movement. When a signal for an approach turns from red to green, the vehicle in front of the queue takes some time to perceive the signal (reaction time) — this is lost time.
The reaction time at the start of green (perceiving the signal change, the blue dot) and the all-red time at the end of the phase are the two components of lost time in a phase.
Effective green time is the actual time available for vehicles to cross the intersection.
where the loss = all-red time + reaction time.
Effective green g₁ spans the green plus yellow portion of the cycle C usable for the movement.
The ratio of effective green time to cycle time is called the green ratio.
where 3600/h is the capacity of the lane when the signal was always green (h = saturation headway per vehicle).
Cycle time of an intersection is 60 sec. Green time (G) is 27 sec and the corresponding yellow time is 4 sec. The saturation headway is 2.4 sec per vehicle, the startup loss time is 2 sec, and the clearance interval is 1 sec. Find the capacity of the movement per lane.
C = 60 s, G = 27 s, Y = 4 s, h = 2.4 s, total loss = 2 + 1 = 3 s.
Capacity = 700 veh/hr/lane
Capacity of lane when signal was always green = 3600/2.4 = 1500 veh/hr/lane.