Hydrology / Hydrograph
Total runoff from the catchment is divided into 4 groups:
In this chapter, our study of hydrograph would be short-term hydrograph, called flood hydrograph, which is used for flood control, flood forecasting, and determination of design discharge for hydraulic structures. A hydrograph involves in itself the combined effect of rainfall and catchment characteristics.
Hydrograph — a rainfall hyetograph produces direct runoff, riding on top of a slowly varying base flow.
The discharge noted in the flood hydrograph can be divided into:
A direct-runoff hydrograph (DRH) does not include base flow.
If two storms occur in a catchment such that the second does not start until the effect of the first has completely ceased (base flow started), the hydrograph so obtained is called an isolated storm hydrograph, and this would generally be a single-peak hydrograph.
If, however, the second storm starts before the effect of the first storm has ceased, the resulting hydrograph is called a complex storm hydrograph. In hydrological analysis, we generally use an isolated storm hydrograph having a single peak.
A — starting point; AB — rising limb; BCD — crest segment; B, D — points of inflection; DE — recession limb; E — end point. tpk is measured from the CG of the hyetograph to the peak C; the base period spans A to E.
Essential components of a hydrograph:
(a) Shape of catchment — a fan-shaped catchment produces a broad, gently rising hydrograph; a fern/leaf-shaped catchment (narrow, elongated) produces a sharper, quicker peak; a catchment shaped so runoff arrives in two pulses produces a multi-peak hydrograph.
(b) Size of catchment — in small catchments, overland flow is more predominant, and in large catchments, channel flow is more predominant. Thus in a small catchment the effect of land use and intensity of rainfall will be more predominant, and in a large catchment, the effect of drainage density will be more predominant. The time base of a large catchment is generally longer as compared to a small catchment.
(c) Drain slope — if the drain slope is large, the peak will come early and the time base will be small.
(d) Intensity of rainfall — if the intensity of rainfall is more, then for a given duration of rainfall, the peak will be high.
(e) Distribution of rainfall — isochrones are lines joining points from where the water particle takes the same time to reach the catchment outlet. When rainfall occurs closer to the outlet, the peak will come early and it will be large, as compared to the situation when rainfall occurs in an area away from the outlet.
Isochrones drawn as contours of equal travel-time to the catchment outlet.
(f) Time of concentration (tc) — the time taken by a water particle to reach the catchment outlet from the remotest point. If the rainfall duration is greater than or equal to the time of concentration, the intensity of runoff is maximum at the outlet.
Left: intensity–duration curve, with icr occurring at tc. Right: a rainfall of constant intensity applied over infinite time produces an S-curve that levels off at tc.
Separation of base flow from the flood hydrograph (total storm hydrograph) is called hydrograph separation.
Simplest separation: a straight line from the point where the rising limb departs from base flow (A) to the point on the recession limb N days after the peak (E).
More refined separation: a freehand curve from A that dips under the crest before rejoining the linear-to-E segment near the point of inflection C.
When the initial losses and infiltration losses are subtracted from the rainfall hyetograph, we get the effective rainfall hyetograph (ERH). It is also called the hyetograph of rainfall excess or supra rainfall.
The flood data and base flow in a stream is estimated for a catchment area of 600 km². Estimate the rainfall excess, in cm.
| Time (days) | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | Σ |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m³/s) | 20 | 63 | 151 | 133 | 90 | 63 | 44 | 29 | 20 | 30 | 643 |
| Base flow (m³/s) | 20 | 22 | 25 | 28 | 26 | 23 | 21 | 20 | 20 | 20 | 225 |
| DRH (m³/s) | 0 | 41 | 126 | 105 | 64 | 40 | 13 | 9 | 0 | 0 |
Area under DRH, by the trapezoidal rule with 1-day spacing:
Rainfall excess = QV/A:
Rainfall excess = 5.87 cm
A storm over a catchment of area 5 km² has a duration of 14 hr, and a mass curve of rainfall is as given below. If the φ-index of the catchment is 0.4 cm/hr, determine the ERH and the volume of direct runoff from the catchment due to the storm.
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 |
|---|---|---|---|---|---|---|---|---|
| Accumulated rainfall (cm) | 0 | 0.6 | 2.8 | 5.2 | 6.7 | 7.5 | 9.2 | 9.6 |
| Individual (cm) | — | 0.6 | 2.2 | 2.4 | 1.5 | 0.8 | 1.7 | 0.4 |
| Hourly (cm/hr) | — | 0.3 | 1.1 | 1.2 | 0.75 | 0.4 | 0.85 | 0.2 |
| ERH (cm/hr) | — | 0 | 0.7 | 0.8 | 0.35 | 0 | 0.45 | 0 |
With catchment area 5 km² = 5×10² ha, volume of direct runoff over the four 2-hr intervals with positive ERH:
Volume = 23 ha·m
A D-hr unit hydrograph corresponds to 1 cm of effective rainfall applied uniformly at rate 1/D cm/hr over D hours.
The unit hydrograph of a catchment is defined as the hydrograph of direct runoff (DRH) resulting from 1 cm of effective rainfall depth applied uniformly over the catchment area at a uniform rate (intensity), during a specified period of D hr. Thus the intensity of rainfall for a D-hr unit hydrograph is 1/D cm/hr.
D should not be more than: (a) time of concentration tc, (b) lag time tL, (c) period of rise.
φ-index = 1 cm/hr. Ordinates of 2-hr and 4-hr unit hydrographs are given below. Draw the DRH for a hyetograph of 3 cm/hr (0–2 hr) and 4 cm/hr (2–6 hr).
ERH: 0–2 hr at (3−1) = 2 cm excess (over the 2-hr UH), 2–6 hr at (4−1) = 3 cm excess over 4 hr (over the 4-hr UH).
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2-hr UH | 0 | 1 | 3 | 5 | 8 | 12 | 11 | 10 | 7 | 6 | 2 | 0 | |
| 4-hr UH | 0 | 2 | 7 | 10 | 12 | 18 | 20 | 18 | 16 | 14 | 10 | 5 | 3 |
| 2×(2-hr UH) | 0 | 4 | 12 | 20 | 32 | 48 | 44 | 40 | 28 | 24 | 8 | 0 | |
| 3×(4-hr UH), lag 2hr | — | 0 | 24 | 84 | 120 | 144 | 216 | 240 | 216 | 192 | 168 | 120 | 60 |
| DRH combined | 0 | 4 | 36 | 104 | 152 | 192 | 260 | 280 | 244 | 216 | 176 | 120 | 60 |
(Continuing to the tail: 26 hr→96, 28 hr→60, 30 hr→36, 32 hr→12, 34 hr→0.)
Resultant combined DRH, peaking near 280 m³/s around t = 14 hr.
In the above problem, if the base flow is constant up to 16 hr = 30, and thereafter increases by 4 units every 2 hr till the end of 32 hr, calculate the ordinates of the flood hydrograph.
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Base flow | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 34 | 38 | 42 | 46 | 50 | 54 | 58 | 62 |
| Resultant DRH | 0 | 4 | 36 | 104 | 152 | 192 | 260 | 280 | 244 | 216 | 176 | 120 | 96 | 60 | 36 | 12 | 0 |
| Flood hydrograph | 30 | 34 | 66 | 134 | 182 | 222 | 290 | 310 | 274 | 250 | 214 | 162 | 142 | 110 | 90 | 70 | 62 |
Given the ERH as three successive D-hr rainfalls R₁, R₂, R₃ and the resulting composite DRH ordinates x₁…x₈, the D-hr UH ordinates a, b, c, d, e can be recovered by successive elimination:
| Time | DRH ordinate | R₁×D-hr UH | R₂×D-hr UH (lag D) | R₃×D-hr UH (lag 2D) | DRH (by UH) |
|---|---|---|---|---|---|
| 0 | 0 | 0 | 0 | 0 | 0 |
| D | x₁ | R₁a | 0 | 0 | R₁a |
| 2D | x₂ | R₁b | R₂a | 0 | R₁b + R₂a |
| 3D | x₃ | R₁c | R₂b | R₃a | R₁c + R₂b + R₃a |
| 4D | x₄ | R₁d | R₂c | R₃b | R₁d + R₂c + R₃b |
| 5D | x₅ | R₁e | R₂d | R₃c | R₁e + R₂d + R₃c |
| 6D | x₆ | 0 | R₂e | R₃d | R₂e + R₃d |
| 7D | x₇ | 0 | 0 | R₃e | R₃e |
| 8D | 0 | 0 | 0 | 0 | 0 |
Solving in order: x₁ = R₁a ⇒ a; x₂ = R₁b + R₂a ⇒ b; x₃ = R₁c + R₂b + R₃a ⇒ c; x₇ = R₃e ⇒ e; x₆ = R₂e + R₃d ⇒ d — hence find a, b, c, d, e in that order.
Stream flow due to three successive storms of 2.9, 4.9, and 3.9 cm of 6-hr duration each on a basin are given below. Area of catchment is 118.8 km². Assuming a constant base flow of 20 m³/sec, derive a 6-hr UH for the basin. An avg storm loss of 0.15 cm/hr (φ) can be assumed.
| Time (hr) | 0 | 3 | 6 | 9 | 12 | 15 | 18 | 21 | 24 | 27 | 30 | 33 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 20 | 50 | 92 | 140 | 199 | 202 | 204 | 144 | 84.5 | 45.5 | 29 | 20 |
| DRH (m³/s) | 0 | 30 | 72 | 120 | 179 | 182 | 184 | 124 | 64.5 | 25.5 | 9 | 0 |
Effective rainfall (φ = 0.15 cm/hr over 6-hr blocks): 2.9−0.9 = 2 cm, 4.9−0.9 = 4 cm, 3.9−0.9 = 3 cm.
Time base of UH = 33 − 2×6 = 33 − 12 = 21 hr. Solving successively from the DRH table (labelling the 6-hr UH ordinates a…f at t = 3, 6, 9, 12, 15, 18 hr):
6-hr UH ordinates: 0, 15, 36, 30, 17.5, 8.5, 3, 0 m³/s at t = 0, 3, 6, 9, 12, 15, 18, 21 hr
Given a D-hr UH, to find a T-hr UH where T = mD:
Case (a), m = 2: summing a D-hr UH with itself lagged by D hr gives the DRH for 2 cm over 2D hr; dividing by 2 gives the 2D-hr UH.
From the 2-hr UH, obtain the 6-hr UH. Ordinates of the 2-hr UH are given below.
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2-hr UH | 0 | 5 | 25 | 25 | 20 | 15 | 13 | 10 | 8 | 2 | 0 | ||
| lag 2hr | — | 0 | 5 | 15 | 25 | 20 | 15 | 13 | 10 | 8 | 2 | 0 | |
| lag 4hr | — | — | 0 | 5 | 15 | 25 | 20 | 15 | 13 | 10 | 8 | 2 | 0 |
| 3cm DRH, 6hr lag | 0 | 5 | 20 | 45 | 60 | 60 | 48 | 38 | 31 | 20 | 10 | 2 | 0 |
| 6-hr UH (÷3) | 0 | 1.67 | 6.67 | 15 | 20 | 20 | 16 | 12.67 | 10.33 | 6.67 | 3.33 | 0.67 | 0 |
When the new hydrograph duration is not an integral multiple of the D-hr UH, we use the concept of the S-curve.
The S-curve is defined as the hydrograph of direct runoff resulting from a continuous effective rainfall of uniform intensity (1/D) cm/hr, applied forever. It is constructed by adding together a series of D-hr UH, each lagged by D hr. The S-curve attains a constant ordinate, called the equilibrium discharge, approximately at the end of the base period of the first unit hydrograph.
S-curve built from repeated D-hr UH, each lagged D hr, summing to a constant equilibrium ordinate Qmax = A/D.
If we consider two S-curves of D-hr each, lagged by T hr, the difference of the two S-curve ordinates gives the DRH of T-hr rainfall of magnitude (T/D) cm. To obtain the T-hr UH, the (S₁−S₂) ordinate is divided by (T/D):
Ordinates of a 4-hr UH for a particular basin are given. Derive the S-curve and the 2-hr UH. Also calculate the maximum ordinate of the S-curve, taking catchment area = 630 km².
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | 28 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 4-hr UH | 0 | 25 | 100 | 160 | 190 | 170 | 110 | 70 | 30 | 20 | 6 | 1.5 | 0 | ||
| SA (cumulative) | 0 | 25 | 100 | 185 | 290 | 355 | 400 | 425 | 430 | 445 | 446.5 | 446.5 | 446.5 | 446.5 | 436 |
| SB (SA lag 2hr) | 0 | 0 | 25 | 100 | 185 | 290 | 355 | 400 | 425 | 430 | 445 | 446.5 | 446.5 | 446.5 | 436 |
| SA−SB (2cm DRH) | 0 | 25 | 75 | 85 | 105 | 65 | 45 | 25 | 5 | 15 | 1.5 | 0 | 0 | 0 | 0 |
| 2-hr UH (÷2) | 0 | 50 | 150 | 170 | 210 | 130 | 90 | 50 | 10 | 30 | 3 | 0 | 0 | 0 | 0 |
Take TB = 24 hr for the 4-hr UH ⇒ TB = 24 − 2 = 22 hr for the 2-hr UH. Peak ordinate of the S-curve:
Peak ordinate of S-curve = 1.575 Mm³/hr
A distribution graph is basically a D-hr UH with ordinates showing the % of surface runoff occurring in successive D-hr intervals. Duration D is taken as the unit interval; summation of the ordinates equals 100.
On a catchment of 200 ha, rainfalls of 7.5 cm, 2 cm, and 5 cm occurred on three consecutive days. The avg φ-index was 2.5 cm/day. The distribution graph (% of surface runoff, extended over 6 days for every rainfall of such magnitude) is 5, 15, 40, 25, 10, 5. Determine the ordinates of the discharge hydrograph, and also determine the peak discharge. Neglect base flow.
Effective rainfall per day: day1 = 7.5−2.5 = 5 cm; day2 = 2−2.5 < 0 ⇒ 0 cm (no excess); day3 = 5−2.5 = 2.5 cm.
| Time (day) | Dist. graph (%) | 5cm DRH% | 2.5cm DRH% (lag 2day) | Σ DRH% | Vol (ha·m) | Avg ord. (m³/s) |
|---|---|---|---|---|---|---|
| 0 | 5 | 25 | — | 25 | 0.5 | 0.057 |
| 1 | 15 | 75 | — | 75 | 1.5 | 0.174 |
| 2 | 40 | 200 | 12.5 | 212.5 | 4.25 | 0.492 |
| 3 | 25 | 125 | 37.5 | 162.5 | 3.25 | 0.376 |
| 4 | 10 | 50 | 100 | 150 | 3.0 | 0.347 |
| 5 | 5 | 25 | 62.5 | 87.5 | 1.75 | 0.203 |
| 6 | — | — | 25 | 25 | 0.5 | 0.058 |
| 7 | — | — | 12.5 | 12.5 | 0.25 | 0.029 |
Volume for each row = (%DRH/100) × (2 ha·m/100 × effective rainfall depth); e.g. row 0: 25% of the 5 cm rainfall over 200 ha = 0.25×5×2 ha·m = 0.5 ha·m. Average ordinate = volume ÷ (1 day in seconds), e.g. 0.5×10&sup4; m³ ÷ (3600×24) = 0.057 m³/s.
Peak discharge ≈ 0.492 m³/s at t = 2 days
A synthetic UH is obtained for an ungauged catchment (no rain gauges), usually by relating certain catchment characteristics with the UH shape. Once this relationship is available for a catchment having sufficient data, the same relationship can be applied to the UH for an ungauged catchment in the same hydrometeorologically homogeneous area. This UH is called the Synthetic UH (S-UH).
Snyder selected 3 parameters for generating the S-UH: (a) base width T, (b) peak discharge Qpk, (c) lag time tp.
L — catchment length from the catchment divide to the outlet; LCA — distance from the CG of the catchment to the outlet.
Lag time tp is measured from the mid-point of the (tr-hr) rainfall to the peak Qpk.
The UH given by the above formulas is a UH of tr hr duration. If a synthetic UH of another duration D′ hr is to be obtained, the corresponding lag tpr is given by:
Use tpr instead of tp in formulas (a) and (b) — when the modified tpr is put into the equations for T and Qpk, we obtain T and Qpk for the D′-hr S-UH.
To draw a smooth S-UH, we use the formula for the width of the S-UH at 75% and 50% of the peak discharge:
Width of the S-UH at 75% and 50% of peak discharge.
Qpk in m³/s, A in km².
Derive the 3-hr S-UH for a catchment having area 2500 km². Length of the main stream is 120 km. Distance from the CG of the catchment to the gauging station is 80 km. Take Ct = 1.5, Cp = 0.6. Use Snyder's method.
tpr = 23.166 hr, Qpk = 180 m³/s, T = 141.49 hr, W₁₀₀ = 57.42 hr, W₅₀ = 100.27 hr
Two catchments X and Y are considered to be meteorologically homogeneous. Characteristics: X — L = 50 km, LCA = 30 km, A = 500 km²; Y — L = 80 km, LCA = 60 km, A = 1000 km². For catchment X, the UH developed is of 2-hr duration, peak discharge 80 m³/s, time of peak from the beginning of rainfall is 13 hr. Find the S-UH for catchment Y.
tpr for X = 13 − 2/2 = 12 hr (peak time measured from mid-point of the 2-hr rainfall). Since D′ = 2 hr may not equal tr for X, first back-calculate tp and Ct, Cp for X:
Applying the same Ct, Cp to catchment Y:
For catchment Y: tp = 17.04 hr, Qpk = 112.57 m³/s, T = 123.12 hr
A 1-hr triangular UH of a watershed has a peak discharge of 60 m³/s @ the 10th hr, and time base of 30 hr. The φ-index is 0.4 cm/hr, and base flow is 15 m³/s. (a) Calculate the catchment area of the watershed. (b) If there is rainfall of 5.4 cm in 1 hr, find the ordinate of the flood hydrograph @ the 15th hr.
(a) Area under the triangular UH = 1 cm of runoff over the catchment:
Catchment area = 324 km²
(b) Effective rainfall = 5.4 − 0.4 = 5 cm; the flood-hydrograph ordinate at the 15th hr (5 hr past the UH peak, on the receding limb) scales as (300/20)×15 × 5 (interpolating the triangular UH ordinate at t=15 and scaling by 5 cm):
Flood hydrograph ordinate @ 15th hr = 240 m³/s
A UH of infinitesimal duration is called the instantaneous unit hydrograph (IUH). It is mainly used when the intensity of rainfall is continuously varying, because in this case we need to divide the rainfall into very small durations and find out the response of each on the runoff.
The main advantage of IUH is that it is independent of the duration of ERH. IUH is thus independent of the rainfall characteristics, and is indicative of the catchment characteristics only.
IUH can be obtained approximately using an S-curve, where the ordinate of IUH at any time t (u(t)) is the slope of the 1-hr S-curve (i = 1 cm/hr). We generally use the Nash model and the Clark model to obtain the IUH.