Design Flood

The maximum flood that any structure can safely pass is called the design flood. The magnitude of the design flood is based on the acceptable risk of exceedance.

In design flood estimates, we use the following terms:

SPF — Standard Project Flood

The flood likely to occur due to severe rainfall conditions, but excluding extremely rare situations. SPS (Standard Project Storm) is used to measure it.

PMF — Probable Maximum Flood

Uses the rarest combination of various factors. PMF is used for the design of spillways. PMP (Probable Maximum Precipitation) is used to obtain PMF.

Guidelines for selecting design floods (CWC, India):

StructureDesign flood to use
(a) Spillway for major & medium projects, storage > 60 Mm³max(PMF, T = 1000 years)
(b) Permanent barrage & minor dams, capacity < 60 Mm³max(SPF, T = 100 years)
T — return period

Methods to Obtain Design Flood

  1. Physical indication of past flood — obtained by local inquiry and flood marks.
  2. Envelope curve — drawn for various flooding data in similar catchments; from the enveloping curve, the design discharge can be obtained.
magnitude of flood Area

Envelope curve — the enveloping curve over scattered flood-magnitude vs. area data points from similar catchments

  1. Empirical methods — Qp = K An, where K, n are constants, Qp in m³/s, A in km².

Empirical Formulas

Dickens' formula: QD=CDA3/4

For North and Central India.

Ryves' formula: QR=CRA2/3

For South India.

Inglis' formula: QP=124AA+10.4

For Maharashtra and Western Ghats.

D I R

Approximate zones (schematic, not to scale) — D: Dickens' formula (North & Central India), I: Inglis' formula (Maharashtra & Western Ghats), R: Ryves' formula (South India)

Rational Formula

In this method, it is assumed that maximum flood flow is preceded by a certain rainfall intensity having duration equal to the time of concentration.

QP=CiA
C — imperviability factor / runoff coefficient
A — area of catchment

Rational formula is used only when the catchment area is less than 50 km².

Intensity–Duration–Frequency (IDF)

max intensity duration icr tc Return period-2 Return period-1

IDF curves — icr is the rainfall intensity having duration = tc

icr=KTx(tc+a)m
icr — cm/hr
T — return period (years)
tc — hr
K, x, a, m — constants

For a given catchment, icr is a function of time of concentration and return period.

Time of Concentration

By US practice:

tc=Ct(LLcaS)n
tc — hr; L, Lca — km; S — slope of basin

Kirpich formula:

tc=0.01947L0.77S−0.385
tc — minutes
L — longest path travelled by water, in m
S — slope of catchment
S=ΔHL
ΔH — elevation difference between the remotest point of the catchment and the catchment outlet

Composite Catchment — Weighted Runoff Coefficient

When the catchment consists of different types of surfaces, we find the equivalent runoff coefficient to use in the rational formula:

C₁A₁ C₂A₂ C₃A₃ C₄A₄ C₅A₅ C₆A₆

Composite catchment split into 6 sub-areas (pie-wedge division from the catchment centroid) with different runoff coefficients

Cavg=∑CiAi∑Ai

Frequency Analysis

Frequency analysis uses the concept of predicting a future flood event on the basis of past records. It requires a minimum of 20 years of annual series data available (the maximum flood of every year).

We arrange the magnitude of past flood records in decreasing order and assign an order number (m) to each — the highest flood gets order no. 1, and the lowest flood gets order no. N, where N is the number of years of record.

T=N+1m

Weibull's approach.

T — return period of any flood discharge at order no. m

Return period represents the average number of years in which the given flood is equalled or exceeded. A graph is plotted between flood magnitude and return period.

Qpf return period (T)

By interpolation or extrapolation, the flood magnitude of any desired return period can be found. Large-range extrapolation introduces significant error — for large return periods, theoretical probability distribution methods are used instead: (a) Gumbel's method (V.V. important) and (b) Log-Pearson method

Worked Example — Weibull Interpolation (Gandhi Sagar Dam, Chambal River)

Flood frequency computation yielded:

Return period (years)Peak flood (m³/s)
5040,809
10046,300

Find the peak discharge for a 500-year return period.

Using XT = X̄ + KTσN−1, and the fact that KT is linear in the reduced variate YT = −ln[ln(T/(T−1))]:

X500−X100X100−X50=Y500−Y100Y100−Y50
X500−463005491=−lnln500499+lnln10099−lnln10099+lnln5049

X500 = 58,988.86 m³/s

Gumbel's Method

XT=X¯+KTσN−1
XT — value of flood magnitude of return period T years
X̄ — mean value of flood magnitude of annual series data
σN−1 — standard deviation of flood magnitude of the past records
KT — frequency factor
X¯=∑XiN σN−1=∑(Xi−X¯)2N−1
KT=YT−YnSn
Yn, Sn — mean and standard deviation of the reduced variate, Yn = f(N), Sn = f(N)
If N → large: Yn = 0.577, Sn = 1.2825
YT=−lnlnTT−1
T — return period, in years
Worked Example — Recurrence Interval & Exceedance Probability

The maximum annual flood on a river was statistically analyzed for 93 years (1876 to 1968). The mean annual flood and std. dev. are X̄ = 14210 m³/s, σN−1 = 9700 m³/s.

(1) Determine the recurrence interval of the highest flood of magnitude 42500 m³/sec using Weibull's method, and find its chance of exceedance in (a) 1 year, (b) at least once in 10 years.

(a) N = 93, using Weibull P = m/(N+1) for the highest flood (m = 1):

P=194×100=1.06%

(b) At least once in 10 years, with q = 93/94:

P(n)=1−qn=1−(9394)10=10.14%

Recurrence interval ≈ 94 years (1.06% chance in 1 year); ≈ 10.14% chance of at least one occurrence in 10 years

(2) What is the recurrence interval of a design flood of magnitude 49500 m³/sec, and also of a flood of magnitude 42500 m³/s, using Gumbel's method?

49500=14210+−lnlnTT−1−0.5771.2825⋅9700

T ≈ 188.67 years

42500=14210+−lnlnTT−1−0.5771.2825⋅9700

T = 75 years

For the average of an annual series, Gumbel's method gives T = 2.33 years:

−lnlnTT−1=0.577⇒T=2.33

Hence, a flood with return period of 2.33 years is called the mean annual flood.

Confidence Limit

The value of XT (design flood discharge) obtained using Gumbel's method is subject to error due to limited data available. Hence it is desirable that a confidence limit of the estimate be obtained. The confidence interval of XT is bounded by X1 and X2:

X1,2=XT±f(α)⋅Se
f(α) — function of confidence probability (α)
α (%)508095
f(α)0.6741.2821.96

To be remembered.

Se=bσN−1N b=1+1.3KT+1.1KT2
Se — probable error
σN−1 — std. deviation of available records
N — number of years of record
Worked Example — Flood Discharge & 95% Confidence Limit (Ganga at Haridwar)

92-year records of flood discharge of river Ganga at Haridwar are available. Mean = 6437 m³/s, std. dev. = 2951 m³/s. Using Gumbel's method, find the flood discharge with a return period of 500 years. Also calculate the 95% confidence limit of the 500-year return period discharge. Take Yn = 0.5589, Sn = 1.2020 for N = 92 years, and f(α) for 95% confidence = 1.96.

XT=6437+6.213−0.55891.2020⋅2951

XT = 20,319.73 m³/s (T = 500 years)

Confidence limit: KT = 4.704, b = 5.6089, Se = 1725.66 m³/s

X1,2=20319.73±1.96×1725.66=20319.73±3382.31

X₁ = 23,702.04 m³/s, X₂ = 16,937.41 m³/s

Risk and Reliability

Risk is the probability of occurrence of an event x ≥ xT at least once in N successive years.

Risk=1−qN=1−(1−1T)N
q = 1 − 1/T = 1 − p,   p = 1/T

Reliability is the non-exceedance probability in N successive years.

Reliability=qN=(1−p)N=(1−1T)N
Reliability=1−Risk
Worked Example — Bridge Design Risk

A bridge has an expected life of 25 years and is designed for a flood magnitude of return period 100 years. (a) What is the risk of this hydrological design? (b) If a 10% risk is acceptable, what is the return period to be adopted?

(a) N = 25, T = 100:

Risk=1−(99100)25

Risk = 22.2%

(b) For 10% acceptable risk:

0.10=1−(1−1T)25

T = 237.78 years

Note

FOS=Design dischargeEstimated discharge