Hydrology / Runoff & Yield
Compact (circular) catchment → short tc; long narrow catchment → longer tc
The catchment shape is quantitatively represented by (a) Form Factor and (b) Compactness Factor.
A long, narrow catchment leads to a smaller form factor and a lower peak runoff.
Smaller the compactness factor, more rapid would be the runoff. The smallest possible value of compactness factor is 1 (for a circular catchment).
Vegetation delays and lowers the peak discharge
A hydrograph is a plot of discharge in a stream against time. Depending on the unit of time, we can have annual, monthly, seasonal and flood hydrographs.
For hydrograph studies, streams are classified as:
Water is available throughout the year and base flow contribution is significant.
Perennial stream — continuous base flow, with a rainfall-driven peak superimposed
Limited base flow contribution. Base flow occurs significantly only during the wet season; during the dry season, the water table falls below the bed of the river.
Intermittent stream — flow tapers to near-zero once base-flow contribution ends
Discharge exists in the channel only during rainfall. There is no base flow contribution. Sometimes there are no fixed channels either — mostly exists in arid regions.
Ephemeral stream — discharge only during rainfall events, no base flow between storms
From the record of rainfall and runoff available, we generally find out the relationship between rainfall and runoff using regression analysis — mostly linear regression.
Starting from R = CP + D, summing over all n data points:
Solving the first equation for D:
Substituting into the second equation and solving for the slope C:
The correlation between rainfall and runoff is called a good relation if the correlation coefficient lies between 0.6 and 1:
Gives monthly runoff from monthly rainfall. Indirectly based on the water balance concept and mean monthly catchment temperature.
For temperatures below 4.5°C, Lm is read off a reference table instead:
| Tm | 4.5°C | −1°C | −6.5°C |
|---|---|---|---|
| Lm (cm) | 2.17 | 1.78 | 1.52 |
Calculate the annual runoff given monthly temperature and rainfall data (Tm > 4.5°C throughout, so Lm = 0.48Tm):
| Month | Temp (°C) | Rainfall Pm (cm) | Lm = 0.48Tm (cm) | Rm = Pm−Lm (cm) |
|---|---|---|---|---|
| 1 | 12 | 4 | 5.76 | 0 |
| 2 | 16 | 4 | 7.68 | 0 |
| 3 | 21 | 2 | 10.08 | 0 |
| 4 | 27 | 0 | 12.96 | 0 |
| 5 | 31 | 2 | 14.88 | 0 |
| 6 | 34 | 12 | 16.32 | 0 |
| 7 | 31 | 32 | 14.88 | 17.12 |
| 8 | 29 | 29 | 13.92 | 15.08 |
| 9 | 28 | 16 | 13.44 | 2.56 |
| 10 | 29 | 2 | 13.92 | 0 |
| 11 | 19 | 1 | 9.12 | 0 |
| 12 | 14 | 2 | 6.72 | 0 |
For each month, if Lm > Pm, Rm is taken as 0 (months 1–6, 10–12). Annual runoff is the sum of the twelve monthly Rm values:
Annual runoff = 34.76 cm
It is a plot of discharge against % dependability — the % of time that a flow was equalled or exceeded.
Flow duration curve — Q₉₀ is the 90% dependable discharge
Small discharges persist longer (e.g. Q = 50 m³/s for 10 months) while large discharges persist briefly (e.g. Q = 200 m³/s for 2 months).
To determine the flow duration curve at a location, the daily flow record is arranged in decreasing order of magnitude and an order number (m) is given to each flow value.
Where two values tie, the lower (minimum) order number of the tied set is used for both, e.g. if ranks {2,3} tie, both take m = min{2,3} = 2.
If the number of data is large, instead of working on individual data, the data is classified into class intervals — probability is then assumed for the midpoint of the class interval. To be extra safe, probability can instead be taken corresponding to the lowest value of runoff in the class interval.
Observed mean monthly flow of a stream for a 1-year period (June–May), in m³/s:
| Month | Observed flow | Decreasing order | m | % dependability = m/(N+1)×100 |
|---|---|---|---|---|
| June | 18 | 46 | 1 | 7.69 |
| July | 20 | 42 | 2 | 15.38 |
| Aug | 46 | 37 | 3 | 23.07 |
| Sept | 42 | 33 | 4 | 30.77 |
| Oct | 37 | 30 | 5 | 38.46 |
| Nov | 30 | 23 | 6 | 46.15 |
| Dec | 33 | 21 | 7 | 53.85 |
| Jan | 23 | 20 | 8 | 61.53 |
| Feb | 20 | 20 | 8 | |
| Mar | 21 | 19 | 10 | 76.92 |
| Apr | 19 | 18 | 11 | 84.62 |
| May | 8 | 8 | 12 | 92.30 |
(a) The flow that can be expected 80% of the time?
Interpolating between m=2 (42 m³/s, 15.38%) and m=3 (37 m³/s, 23.07%):
Flow at 80% dependability ≈ 18.6 m³/s
(b) % dependability of a discharge of 40 m³/s?
Interpolating between m=3 (37 m³/s, 23.07%) and the 40 m³/s point on the same segment:
% dependability of 40 m³/s ≈ 18.46%
(c) A run-off-river plant is proposed at the catchment outlet. What pump power can be produced, assuming average head available = 5 m, η = 60%, for 90% dependability?
Interpolating between m=11 (18 m³/s, 84.62%) and m=12 (8 m³/s, 92.30%) for 90% dependability:
Power = 0.6 × 9810 × 11.00 × 5 = 323.734 kW
Number of days of flow in each class interval, over water years 61–62, 62–63, 63–64 (combined 61–64):
| Daily discharge (m³/s) | 61–62 | 62–63 | 63–64 | 61–64 (m) | % dependability |
|---|---|---|---|---|---|
| 140–120.1 | 0 | 1 | 5 | 6 | 0.604 |
| 120–100.1 | 2 | 7 | 10 | 25 | 2.51 |
| 100–80.1 | 12 | 18 | 15 | 70 | 7.05 |
| 80–60.1 | 70 | 60 | 64 | 264 | 26.58 |
| 60–40.1 | 84 | 75 | 76 | 499 | 50.25 |
| 40–30.1 | 61 | 50 | 61 | 671 | 67.57 |
| 30–25.1 | 43 | 45 | 38 | 797 | 80.26 |
| 25–20.1 | 15 | 32 | 15 | 859 | 86.50 |
| 20–15.1 | 28 | 30 | 25 | 942 | 94.86 |
| 15–10.1 | 15 | 18 | 12 | 987 | 99.39 |
| 10–5.1 | 5 | 0 | 0 | 992 | 99.89 |
Probability is taken corresponding to the lowest (minimum) discharge in each class interval, for a conservative estimate.
Q₉₀ — interpolating between 26.58% (60.1 m³/s) and 50.25% (40.1 m³/s):
Q₉₀ = 40.32 m³/s
Q₉₅ — interpolating between 67.57% (30.1 m³/s) and 80.26% (25.1 m³/s):
Q₉₅ = 27.17 m³/s
It is the graph of cumulative volume of runoff against time. The flow mass curve is used for reservoir capacity determination — a tangent to the flow mass curve at any point represents the discharge at that point.
Flow mass curve — cumulative runoff volume vs. time
Assume the reservoir is full at point O (start of record).
O→A: supply rate > demand rate (spilling, α); A→B: demand > supply (depletion, β, max deficiency at B); B→D: supply > demand again (water accumulates, reservoir refills at D). The supply (mass) curve itself always rises left to right — only its slope changes.
Reservoir cross-section — live storage (usable capacity) above dead storage, spillway at full-reservoir level, sluice gate below
Obtain reservoir capacity from the following data (runoff volume Vi repeating year to year, demand Di — a constant monthly demand — in Mm³). Since the critical drawdown period can straddle a year boundary, the sequent-peak analysis is run over two consecutive years of the same repeating record:
| Year | Year 1 | Year 2 | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Month | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May |
| Vi | 3 | 6 | 16 | 30 | 18 | 15 | 10 | 8 | 6 | 4 | 3 | 1 | 3 | 6 | 16 | 30 | 18 | 15 | 10 | 8 | 6 | 4 | 3 | 1 |
| Di | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 |
| Vi−Di | −5 | −2 | 8 | 22 | 10 | 7 | 2 | 0 | −2 | −4 | −5 | −7 | −5 | −2 | 8 | 22 | 10 | 7 | 2 | 0 | −2 | −4 | −5 | −7 |
| Cumulative | −5 | −7 | 1 | 23 | 33 | 40 | 42 | 42 | 40 | 36 | 31 | 24 | 19 | 17 | 25 | 47 | 57 | 64 | 66 | 66 | 64 | 60 | 55 | 48 |
Reading the two-year cumulative row: starting from the initial peak of 0, it first dips to a trough of −7 (end of Year 1 July) — a drawdown of 7. It then climbs past 0 to a higher peak of 42 (Year 1 Dec–Jan), and from that peak declines all the way to a trough of 17 (Year 2 July) before climbing past 42 again at Year 2 September. That second peak-to-trough drawdown, 42 − 17 = 25 Mm³, is larger than the first (7 Mm³), so it governs. Since the record is periodic, no drawdown beyond this repeats any larger.
Maximum deficit = 32 Mm³ = Reservoir Capacity
The maximum spilling capacity of the spillway should be decided on the basis of the maximum individual surplus volume. Here, with a peak monthly surplus of 22 Mm³ over 30 days:
If there is no wastage of water, as in the case of a water-supply reservoir, storage capacity determination is as follows — the cumulative demand curve is a straight line (constant demand), against the cumulative supply curve.
The storage reservoir capacity in this case is the summation of the maximum consecutive {surplus, deficit}. This is the condition under a no-spilling situation.
In a water supply scheme, the hourly demand and pump supply are given below. An overhead tank is to be provided for a town water supply. Calculate the minimum capacity of the tank required as balancing storage.
| Time (hr) | Pump rate Vi (lt) | Demand Di (lt) | Cum. Vi (lt) | Cum. Di (lt) | Vi−Di (lt) |
|---|---|---|---|---|---|
| 0–4 | — | 13,333 | 0 | 13,333 | −13,333 |
| 4–6 | 50,000 | 40,000 | 50,000 | 53,333 | −3,333 |
| 6–10 | 1,00,000 | 1,20,000 | 1,50,000 | 1,73,333 | −23,333 |
| 10–12 | 50,000 | 33,333 | 2,00,000 | 2,06,666 | −6,666 |
| 12–15 | 0 | 25,000 | 2,00,000 | 2,31,666 | −31,666 |
| 15–16 | 25,000 | 8,333 | 2,25,000 | 2,39,999 | −14,999 |
| 16–20 | 1,00,000 | 1,06,666 | 3,25,000 | 3,46,665 | −21,665 |
| 20–23 | 75,000 | 50,000 | 4,00,000 | 3,96,665 | +3,335 |
| 23–24 | 0 | 3,335 | 4,00,000 | 4,00,000 | 0 |
Tank capacity = 35,000 litres. The tank runs empty between 12–15 hr.
Water level in the tank through the day (litres):
| 0–4 | 18,333 | 12–15 | 0 | 20–23 | 35,000 |
|---|---|---|---|---|---|
| 4–6 | 28,333 | 15–16 | 16,667 | 23–24 | 31,666 |
| 6–10 | 8,333 | 16–20 | 10,000 | ||
| 10–12 | 25,000 |
Drought is a creeping phenomenon during which the quantity of water available degrades. Drought can be classified as:
Represents a deficiency of precipitation. It is a situation when precipitation is less than 75% of the normal value.
If meteorological drought prolongs, it results in hydrological drought — dry reservoirs and a lowering of the ground water table.
If soil moisture falls below the optimum moisture required for plant growth, it is called agricultural drought.
| Decrease from normal precipitation | Classification |
|---|---|
| < 25% | No drought |
| 26–50% | Moderate drought |
| > 50% | Severe drought |
If the probability of drought is 20–40% in an area, the area is called a drought-prone area. If greater than 40%, the area is called a chronically drought-prone area.
Agricultural drought is classified on the basis of the Aridity Index (AI):
The departure of AI from its normal value is called AI anomaly:
| AI anomaly | Classification |
|---|---|
| < 25 | Mild arid |
| 26–50% | Moderate arid |
| > 50 | Severe arid |
Other terms used to classify agricultural drought are (a) Palmer Index and (b) Moisture Availability Index.