Transportation Engineering / Surveying

SURV-03B Chaining Equipment, Instruments & Ranging

Converted from handwritten notes — SURVEYING 03.pdf, pages 9–19

Doc No.SURV-03B
StatusDraft — Awaiting Review
Converted31-07-2026
Approved—

Tapes

Cloth / linen tape
Made up of closely woven linen or synthetic material, varnished to resist moisture. Does not remain straight during strong winds.
Metallic tape
Made up of linen with brass or copper wire woven into it, and varnished. Gives better results in comparison to the cloth tape because stretching is reduced.
Steel tape
Made up of stainless steel.
Invar tape
Invar is an alloy of steel (64%) and nickel (36%). Highly accurate, with a very small thermal coefficient of linear expansion — but requires much attention in handling, as it is soft and deforms easily.

Accessories for chaining

Pegs
Used to mark a definite point on the ground, temporarily or semi-permanently.
Arrow
Used by the leader to mark the end points of the chain, which are later collected by the follower. The number of arrows with the follower signifies the number of chain lengths measured.
Ranging rod
Used to locate intermediate points along a survey line — this process is called ranging.
Offset rod
A ranging rod with slots made at right angles, used for taking offsets.

Equipment for measuring right angles

Cross staff / open cross staff

Used for setting out offsets at right angles at any point of the survey line.

N slot S slot E slot W slot

Open cross staff: two pairs of slotted plates mounted at right angles on a staff head, giving two perpendicular sight lines through the slots.

French cross staff

Used to establish offsets at 45°, 90°, 135° with respect to the chain line.

chain line 90° 45° 135°

Octagonal case: the three dashed diagonals through the centre give sight lines at 45°, 90° and 135° to the chain line (the solid horizontal diameter).

Optical square

Used to set out right angles. It uses the principle of double reflection. The index mirror is fully silvered; the horizon glass is half silvered (top) and half unsilvered / plain (bottom).

Double-reflection principle Deviation of line of sight=2×(angle between the two mirrors)
Eye I index mirror (fully silvered) H horizon glass (half silvered / half clear) Rod 1 Rod 2

Rod 2 is seen directly through the clear lower half of the horizon glass. Light from Rod 1 (at 90° to Rod 2) reflects off the fully-silvered index mirror, then off the silvered upper half of the horizon glass, into the eye — the two mirrors are set 45° apart, giving a 90° total deviation.

Prism square: has a similar arrangement to the optical square, with the mirrors replaced by prisms.

Measuring ground slope — simple clinometer

plumb bob protractor θ

A protractor with a hanging plumb bob, hinged at the sight axis, is used to measure the slope angle θ of the ground.

Ranging

The process of establishing intermediate points on a straight line is called ranging. There are three methods of ranging:

  1. Direct ranging
  2. Indirect ranging
  3. Random line method

Direct ranging

Intermediate points are established along a chain line by direct observation from the end stations.

Indirect ranging / reciprocal ranging / repeated alignment ranging

This method is adopted when the end points are not intervisible, due to rising ground between them or due to a long distance between the ends. Two intermediate stations (say C and D) are chosen such that: from station C, D and B are visible; from station D, A and C are visible.

A B C D rising ground between A and B blocks direct visibility

C sees D and B; D sees A and C. By repeated (reciprocal) adjustment of C and D, both are brought exactly onto line AB.

Random line method

Line AB is the original line to be established. B′ is a point from which B is visible and the line AB′ is clear.

Random line method (similar triangles) AB′AC′=BB′CC′ CC′=BB′AB′×AC′
A B B′ C C′ true line AB cleared line AB′

Worked to scale: AB′ = 580.2, BB′ = 15, AC′ = 350.2 ⇒ CC′ = (15/580.2)×350.2 = 9.05 (matches the plotted offset exactly).

Linear measurement with chain

(A) On smooth level ground

If the distance to be measured is longer than one chain length, then by establishing intermediate stations in line with the end stations, we can determine the distance.

(B) On sloping ground

On sloping ground the distance can be measured by (a) stepping, or (b) measuring along the slope.

θ L L cos θ

Measuring along the slope: horizontal distance = L cos θ. Verified: with θ ≈ 29.1° here, L cosθ = 205.9×0.875 ≈ 180, matching the drawn horizontal leg.

If the ground slope is regular / uniform, measuring along the slope is possible; but if a variable slope is observed, the stepping method is used. While stepping, we follow the steps down the hill.

l₁ l₂ l₃

Stepping down a hill: each short horizontal length (l₁, l₂, l₃) is measured level, then dropped by plumb bob to the next ground point — every horizontal step is shorter than its corresponding slope segment.

Errors in chaining

Errors in chaining are of two kinds:

  1. Compensating error
  2. Cumulative error / systematic error

Compensating error

Compensating errors are liable to occur in both directions and tend to compensate (cancel out). They cannot be corrected, as the nature/sign of the error is not known.

Compensating error∝Length of line

Systematic / cumulative error

Cumulative errors occur in the same direction and tend to accumulate, thereby significantly increasing or decreasing the measurement.

Cumulative error∝Length of line