Open Channel Flow / Most Efficient Trapezoidal, Triangular and Circular Sections

Most Efficient Trapezoidal, Triangular and Circular Sections

Converted from handwritten notes — OCF 02.pdf, pages 10–17

Doc No.OCF-02B
StatusDraft — Awaiting Review
Converted11-08-2026
Approved—

Fully-Optimized Trapezoidal Channel (Side Slope Also Variable)

Continuing from Case 1 (previous note): holding the Case 1 relation and now also applying dP/dm = 0:

dPdm=0
−2m+41+m2⋅m1+m2=0
4m1+m2=1⇒4m2=1+m2⇒m2=13
tanθ=3⇒θ=60°

Side slope angle from the horizontal is exactly 60°.

R=y2,  P=23y,  B=23y,  A=3y2
A D B C y 60° 60° 60° 60° ∇ AB = BC = CD (half-hexagon)

Fully-optimized trapezoid: each side (AB, BC, CD) equal in length, all base angles 60° — a semicircle of radius y inscribes exactly, touching the bed and both sloping sides

60° 60°

The channel section is exactly half of a regular hexagon

Result The fully most-efficient trapezoidal channel is a half-hexagon: side slope m = 1/√3 (60° from horizontal), R = y/2, top width = bottom width × √3 = 2 × sloping side length.

Triangular Channel

y 2θ φ 1 m tanφ = 1/m

Symmetric triangular (V-notch) channel: apex half-angle θ, side slope 1:m, tanφ = 1/m

A=my2  (constant),  P=21+m2⋅y
P=2A1+m2m

Substituting y = √(A/m). For efficient channel, dP/dm = 0:

m(2m)−(1+m2)⋅1m2=0⇒m2−1m2=0
m2=1⇒tanφ=1⇒φ=45°⇒2θ=90°⇒θ=45°

Apex angle of the most efficient triangular channel = 90°.

R=AP=my221+m2y=y22

Hydraulic radius of the most efficient triangular channel = y/(2√2).

Worked Example — Design an Efficient Trapezoidal Channel

Problem

Design a hydraulically efficient trapezoidal channel for conveying 100 m³/s of discharge if Manning's n = 0.015 and bed slope = 1/5000. Add free board of 10% of the depth of flow. Compute Froude number and sketch the c/s.

1 m θ=60° y B

m = 1/√3 (the fully-optimized half-hexagon result) — solve for B, y, θ

B=1+m2y=43y  (side slope = bottom width : depth, for θ=60°)
100=10.015(43y⋅y+my2)(y2)23(15000)12
100=10.015(3y2)(y2)23(15000)12

Using A = √3·y² (the half-hexagon area) and R = y/2.

y=5.564 m
B=1+m2y=6.424 m
free board=0.556 m  (10% of y)
free board = 0.556 m y = 5.564 m B = 6.424 m 60°

Final design — y = 5.564 m, B = 6.424 m, free board = 0.556 m, side slope at 60°

Worked Example — Efficient Channel with a Fixed Side Slope

Problem

Q = 8 m³/s, S₀ = 0.0002, n = 0.015. Design an efficient channel with one side vertical and the other sloped at 45° (m = 1).

1 1 y B

One side sloped at 45° (m=1), one side vertical

A=By+12y2,  P=B+y+2y
P=Ay−y2+2y+y

For efficient channel, dP/dy = 0:

−Ay2+12+2=0⇒A=(2+12)y2
By+12y2=2y2+12y2⇒B=2y
A=(22+1)y22,  P=(22+1)y,  R=AP=y2

R = y/2 holds here too, consistent with the general Case-1 trapezoidal result.

y=2.078 m,  B=2y=2.929 m

Solved from Manning's equation with the above A, R, n=0.015, S₀=0.0002.

Circular Channels

2θ y dia = D

Circular channel flowing part-full — water surface subtends angle 2θ at the center; depth y measured from the invert

A=πD24×2θ2π−12⋅(D2)2sin(2θ)

Sector area minus the triangular chord area (2θ in radians).

P=πD⋅2θ2π=Dθ
Q=1nA(AP)23S012,  V=1n(AP)23S012

For Q to be maximum, dQ/dθ = 0. For V to be maximum, dV/dθ = 0 — these give different angles, since A itself varies with θ at fixed D.

Maximum velocity:  2θ=257°50′,  yD=0.81,  AP=0.3D
Maximum discharge conditionManningChezy
2θ302° 20′303°
y/D0.9380.95
R0.29D0.29D
Note Both the maximum-velocity and maximum-discharge conditions occur at more than half depth (y/D > 0.5) — a circular sewer or culvert running slightly less than completely full actually carries more discharge, and flows faster, than one running exactly full.

Compound (Composite) Section

Roughness characteristics are different in different parts of the section — each sub-area is analyzed with its own roughness and summed.

A G F B C D E 1 2 n₁ n₂

Compound section — main channel (1, roughness n₁) and floodplain (2, roughness n₂), separated by the imaginary line GD

Q=Q1+Q2
Q1=1n1A1R123S012
Q2=1n2A2R223S012
R=AP

Each sub-area's own Ri = Ai/Pi is used inside Qi; the overall R = A/P is only an equivalent value reported for the whole section, not used in the Q sum.