Recap — salinity & alkalinity criteria
If exchangeable sodium % (ESP) > 15%, the soil is classified as alkaline. If EC (electrical conductivity) of the soil, in mmhos/cm, > 4000, the soil is classified as saline.
5 — Sediment Transport
In an alluvial channel, sediments are detached from the bed and sides of the channel and move downstream by flowing water. This phenomenon is called sediment transport.
Note
A channel flowing through non-cohesive sediment (silt, sand & gravel) which can be easily scoured or deposited is known as an alluvial channel.
Boundaries of such a channel are mobile & are not rigid, so a change in the discharge of water will cause a change in the channel's cross-section, bed slope, planform, bed form, and roughness coefficient.
This is due to the complex nature of an alluvial channel.
It is difficult to obtain an analytical solution; hence we go for empirical methods.
Sediment Load
Sediment load is the burden carried by the flowing water in a canal. It is classified as:
Bed load — sediment load that moves along the bed with occasional jumps in the channel.
Suspended load — remains in suspension due to turbulence of the flowing water.
Problems Caused by Sediment Load
Due to large-scale siltation and scouring, irrigation channels become inoperable.
Change in flood level.
Siltation of reservoirs causes reduction in storage capacity.
Reduction in navigation depth.
Incipient Motion of Sediment
Considering the case of clear water flow in an open channel with a movable bed of non-cohesive material at low discharge, the bed material remains stationary and hence the channel can be treated as rigid.
But as we increase the discharge, the shear force applied by the flowing water will increase, and just exceed the resisting force; the particles will start moving on the bed. This condition is called the incipient condition, or critical condition, or threshold condition.
Note
Incoherent → non-cohesive → c = 0. The incipient-motion condition is helpful in fixing the slope or depth of clear-water flow in an alluvial channel.
Force balance on a control volume of the flowing water resting on the channel bed (slope exaggerated for clarity) — weight W resolves into a driving component W sinθ along the bed and a normal component W cosθ, balanced by boundary shear τ₀.
Weight of control volume = γw·A·L, and its component parallel to the bed = γw·A·L·sinθ. Let shear stress on the bed = τ₀.
If θ <<< 1, sinθ ≈ tanθ = θ, and θ = S (bed slope):
τ0 — average unit tractive force, or shear stress
Boundary shear stress is not uniformly distributed along the wetted perimeter (except in very wide channels) — typical distribution on a trapezoidal section: average ≈ 0.75γwRS on the sides, ≈ γwRS on the bed.
Design of Non-Scouring Stable Channel with Protected Side Slope in an Alluvial Channel
Shield's Entrainment Method — Shield gave a semi-theoretical analysis of this problem of incipient motion. According to Shield, critical tractive stress (τc) is required to move grains of diameter D from the bottom of the channel, when D > 6 mm.
Generally, for non-cohesive soil, Gs = 2.65:
For no-scouring condition, τc ≥ τ₀:
For the side slope, with θ = angle between the horizontal and the channel side, φ = friction angle of the bed material:
For no-scouring condition on the side slope:
Note — alternative formulae
Mittal & Swami's formula: τc = 0.155 + 0.409d²mm/√(1 + 0.177d²mm).
Strickler's formula (D in m): n = D1/6/24.
Worked Example
In order to ensure that no scouring takes place in the bed of a channel of bed slope S, constructed on an alluvial soil of particle size dm, flow velocity should be restricted to — (a) 4.85d1/2S−1/6 (b) 4.85d−1/2S1/6 (c) 0.48d1/2S−1/6 (d) 0.48d−1/2S1/6
Manning's equation: V = (1/n)R2/3S1/2, with D = 11RS ⇒ R = D/(11S), and Strickler's n = D1/6/24:
V = 4.85 D½ S−⅙ — matches option (a).
Flagged for review The source boxes this result as “V = 4.85 D½ S⁺₁⁄⁶” (positive exponent on S), but the algebra on the same page (24·11−²⁄³·D⁻¹⁄⁶⁺²⁄³·S⁻²⁄³⁺¹⁄²) only resolves to S−¹⁄⁶, which is also the only exponent that matches one of the four listed options (a). Shown corrected here — please confirm against your source page.
Worked Example
Find the minimum width of a wide rectangular canal. The banks of the canal are protected by some means. Size of the alluvium particles is 5 cm & channel bed slope is 0.01. Q = 3 m³/sec.
d = 5 cm = 0.05 m, S = 0.01. Strickler's n = D1/6/24 = 0.0252.
Since the channel is wide rectangular, R ≈ y, so y = 0.454 m and A = B·y:
B = 2.819 m
Worked Example
An earthen irrigation canal has its bed & side slope composed of cohesionless material having mean dia. 6 mm; the friction angle of the boundary material is 40°. Bed width of canal is 5 m, side slope is 1.5H:1V. Determine the minimum discharge that can be admitted into the canal without any sediment movement. Longitudinal slope of the canal is 1/5000 and n = 0.025.
D = 6 mm = 0.006 m, B = 5 m, S = 1/5000, n = 0.025, φ = 40°.
Bed condition, D = 11RS ⇒ R = D/(11S):
Flagged for review The source's handwritten value here reads R ≈ 2.27 m, but 0.006 ÷ (11 × 1/5000) works out to 2.727 m (looks like a transposed digit). It doesn't change the final answer, since the side-slope check below gives a smaller, governing R either way — shown corrected here.
Side-slope condition, with θ = tan−1(1/1.5) = 33.69°:
Governing case: we take the minimum R such that no scouring takes place — R = 1.843 m (side-slope condition governs).
Velocity from Manning's equation:
With A = (B + my)y = 5y + 1.5y² and P = B + 2y√(1+1.5²) = 5 + 3.605y, and R = A/P = 1.843:
y = 3.07 m, A = 29.487 m² ⇒ Q = A·V = 29.487 × 0.849 ≈ 25.03 m³/sec
Mechanism of Bed Formation
When the applied shear stress (τ₀ < τc), the sediment particles remain stationary and the canal bed can be treated as a rigid boundary. The water surface remains fairly smooth, and resistance offered to the flow is mainly due to channel-grain roughness.
When the velocity is gradually increased, a stage is reached when sediment load just comes at the point of motion — this stage is called the threshold stage of motion.
On further increasing the velocity, sediment particles on the bed start moving when (τ₀ > τc); as a result of this sediment motion, small triangular undulations called ripples form on the bed.
On further increasing the velocity, ripples grow into dunes. When dunes first appear, ripples are superimposed on dunes; but at higher velocity, ripples disappear. Dunes are also triangular undulations, but of larger dimensions.
Progressive change of bed form with increasing velocity: rigid bed → threshold → ripples → dunes → plane (flat) bed with sediment in motion → standing waves that steepen into antidunes and break.
When velocity is increased beyond the dune stage, dunes are washed off and the bed becomes a flat surface with sediment particles in motion, but the water surface is still fairly smooth and levelled.
On further increasing the velocity, a sand wave is formed on the channel bed along with the surface, in unison.
As the velocity is further increased, flow becomes supercritical & surface waves become so steep that they break immediately — this condition is called antidunes.
6 — Lining of Irrigation Canal
Lining of a canal means that the wetted surface of the channel is protected with a stable & impermeable lining surface such as concrete, tile, asphalt etc.
Advantages of Lining
Seepage control — there are certain areas where seepage loss is of the order of 20–50%, which is a huge loss and affects the irrigation potential of the canal. By providing lining, seepage loss can be reduced to 2–5% of its original value.
Prevention of water logging — uncontrolled seepage through an unlined canal raises the water table in the adjoining field up to the ground level. Such fields are called thur, and this phenomenon of the rise of water table is called water logging.
Increase in channel capacity — by permitting a higher velocity of flow, channel capacity is increased.
Note
V = (1/n)R2/3S1/2; n = 0.025 for an earthen channel, n = 0.015 for a concrete channel.
Reduction in maintenance cost — by about 40–50%. In an unlined canal, expenditure may be required on periodical removal of silt deposited on the sides & bed, and periodical repair of banks.
Note
Free board = 0.75 m; design depth = 0.75 + 2.73 = 3.6 m (carried over from a preceding worked example whose full working falls outside this page range).
Worked Example
A trapezoidal lined irrigation canal has 5 m bed width, y = 2.5 m, side slope 1.5H:1V, bed slope 1/1000, n = 0.016. Calculate the maximum carrying capacity of the canal.
B = 5 m, y = 2.5 m, S = 1/1000, n = 0.016. Side slope 1.5H:1V ⇒ θ = tan−1(1/1.5) = 33.69° = 0.588 rad, cotθ = 1.5.
Flagged for review This uses A = By + y²(θ + cotθ) and P = B + 2y(θ + cotθ) — the source's own consistent working (θ in radians, added to cotθ = the side-slope ratio). The standard trapezoidal formulas A = (B + cotθ·y)y and P = B + 2y√(1+cot²θ) would instead give A ≈ 21.875 m² and P ≈ 14.01 m for the same inputs. Reproduced as worked in the source — please confirm which formula your course intends.
Q = A × V = 2.759 × 25.55 = 70.511 m³/sec
Worked Example
Design a lined canal to carry 100 m³/sec on a bed slope of 1/2500. The maximum permissible velocity V = 2 m/sec, n = 0.013, side slope 1.25H:1V.
The source page ends here, at R = 1.482 m. Carrying the same working forward (R = A/P ⇒ P = 50/1.482 = 33.74 m, and solving By + 1.924y² = 50 together with B = 33.74 − 3.848y):
y ≈ 1.635 m, B ≈ 27.45 m (completion beyond the source's cutoff, shown for reference)
7 — Reclamation of Water-Logged & Saline Soil
An agricultural field is said to be water logged when its productivity gets affected by a high water table. Productivity of the field gets affected when soil voids within the root zone of the crop get saturated & become ill-aerated. This ill aeration reduces crop yield.
Causes of Water Logging
Over & intensive irrigation
Seepage from adjoining areas
Inadequate natural drainage
Excessive rainfall
Irregular topography
Preventive Measures
Lining of canal
Reducing intensity of irrigation
Crop rotation
Providing efficient drainage system
Use of lift irrigation
Note
Combined use of sub-surface water (ground water) and surface water (canal water) gives maximum benefit; hence it is called conjunctive use.
Effect of Water Logging
Reduction in productivity
Difficulty in cultivation operations
Growth of weeds
Creation of a hot & damp climate which can lead to spreading of disease
Salinity & alkalinity of soil is increased in the root zone
Note
Water logging & salinity are treated as twin problems. A rising water table brings salt into the root zone of the crop, which affects crop growth. Salt remains behind in the soil when water is taken up by the plant or lost due to evaporation.
Soil Reclamation
Soil reclamation is the process by which unproductive land is made fit for cultivation. This is done by the process of leaching — the field is flooded with an adequate depth of water, which dissolves the salts present in the soil and drains them away by sub-surface or surface drains, or lets them trickle down to the ground water. After that, salt-resistant crops are grown in rotation (e.g. rice, barley).
Gypsum (CaSO4·2H2O) is added to the soil before leaching. Sodium associated with chloride or sulphate ions forms white alkali (e.g. NaCl, Na2SO4), while sodium associated with carbonate forms black alkali (Na2CO3) — more harmful and less soluble in water. Gypsum converts the harmful black alkali into a more soluble, easily-leached salt:
Na2SO4 is more soluble and hence can be easily removed by leaching.
Depth of water required for the leaching process is expressed by the leaching requirement ratio — ratio of depth of water drained out per unit area (Dd) to the depth of irrigation water applied (Di). Since Di = Cu + Dd:
From the salt equilibrium ratio, since salt concentration is directly proportional to EC (Ci = conc. of salt in irrigation water, Cd = conc. of salt in drained water):
Salt concentration in the water extracted from a saturated soil sample is called the saturated extract (EC(es)). EC(dw) is generally twice the value of the saturation soil extract:
Worked Example
Estimate the leaching requirement when EC of saturated extract of soil is 11 μmho/cm and EC of irrigation water is 1.5 μmho/cm.
Land Drainage
Land drainage is the process of removal of excess water from the field. It is classified as open/surface drainage (shallow drains and deep drains) and sub-surface drainage.
Shallow surface drain
Deep surface drain / outlet drain
Function
Drains away excess rainfall water from the field
Carries water from shallow drains, tile drains & excess gravity water
Effect on water logging
Not helpful in removing water from water-logged areas
Useful in removing water from water-logged areas
Tile Drains
Tile drains are provided for soil with poor internal drainage & a high water table, such that they lower the WT below the root zone.
Improves air circulation.
These drains do not create hindrances for cultivation operations, and no cultivation area is lost to these drains.
Removes excess gravity water.
Reduces soil erosion due to surface runoff.
Permits deeper roots, which allow the plant to extract water from greater depth.
Depth & Spacing of Tile Drain
Two adjacent tile drains, centre-spacing S, sitting height a above the impervious stratum inside a graded gravel envelope; b is the height of the drained water table (its highest point, midway between drains) above the impervious stratum — not to scale.
S — centre-to-centre spacing between tile drains
k — coefficient of permeability of soil
q — discharge per unit length of tile drain
a — height of centre of tile drain above impervious stratum
b — maximum height of drained water table above impervious stratum
Note
If the soil is impervious, tile drains are surrounded by a graded/envelope filter, which prevents inflow of soil into the drains and also increases the effective diameter — hence the rate of inflow increases.
Drainage Coefficient
It is defined as the rate at which water is removed by a drain, expressed as the depth of water removed in 24 hours from the drainage area. Its recommended value is 1% of average annual rainfall to be removed per day. Let average annual rainfall = α m; discharge per unit length of drain, over a strip of width S:
Size of Tile Drain
The size of a tile drain is designed according to Manning's formula, to carry the discharge coefficient of the area. The longitudinal slope shall be 0.05%–3%, but the recommended value is 0.2%.
Worked Example
In a tile-drainage system, the drains are laid with their centre 1.5 m below ground level (G.L.); the impervious layer is 9 m below G.L.; average annual rainfall in the area is 80 cm. 1% of the annual rainfall is to be drained out in 24 hours. To keep the highest position of the water table 1 m below ground level, find the spacing between tile drains.
k = 10−3 cm/sec = 10−5 m/sec. a = 9 − 1.5 = 7.5 m; b = 9 − 1 = 8 m. Discharge per unit length depends on the spacing itself: q = (0.01 × 0.8 × S)/(8.64×10⁴).
S = 57.86 m
Worked Example
Find the size of the outlet of a 6-hectare drainage area, if the drainage coefficient is 1 cm and the tile grade is 0.3%. n = 0.011.
A drainage coefficient of 1 cm means that 1 cm depth of water entering the drains is removed in 24 hours from the 6-hectare area.
For a circular pipe flowing full, A = πD²/4, R = D/4:
D = 0.131 m
Design of Gravity Dam (Forces, Uplift & Criteria)
A dam is a type of obstruction or barrier constructed across a river such that a pool of water is collected on the upstream side. This pool of water collected on the upstream of a dam is called a reservoir.
Types of Dam
Gravity dam — a masonry or concrete dam which resists the force exerted on it by its own weight. Its cross-section is approximately triangular in shape. Eg: Bhakra Nangal Dam, on the Sutlej river.
Arch dam — a curved masonry or concrete dam, convex upstream, which resists the force exerted on it by horizontal arch action. Best suited to narrow and extremely high-sided valleys. Eg: Idukki Dam.
Rock-fill dam — built up by piling up rock fragments and boulders of large size in the river bed; an impervious membrane (cement concrete to asphalt concrete) is placed on the U/S face of the rock fill to make it watertight. Eg: Ramganga Dam, Uttarakhand.
Earth dam — made up of soil which is compacted to resist the force exerted on it, mainly due to the shear strength and weight of the soil. Constructed in areas where the foundation cannot bear the load of concrete. Eg: Hirakud Dam, Odisha.
Coffer dam — a temporary structure designed to keep water and/or soil out of the excavation in which a structure or bridge pier is built, when the construction takes place below water level.
Coffer dam — double-walled temporary enclosure with fill between the walls, keeping the excavation dry while the main structure is built.
Steel dam — consists of a steel framework with a steel plate on its U/S face; used as a coffer dam for construction of the main dam.
Timber dam — mainly used for minor work such as irrigation or cattle feeding.
Rubber dam — made up of huge cylindrical shells of synthetic rubber, which can be inflated by compressed air or pressurised water; they can be deflated when water has to be released. (Example name illegible in the source page.)
Check dam — small, often temporary dams constructed across a waterway to counteract erosion by reducing flow velocity, or for storage of water on the U/S side.
Selection Criteria for Dam Site
Topography — valley shape should preferably be narrow, or a moderately wide 'V' or 'U' shape with a low submergence area.
Foundation — should be strong, with high bearing capacity and offering high resistance to erosion & percolation. A suitable site for the spillway shall also be selected.
Material & labour required for the dam should be easily & locally available.
Value of the area submerged by the dam shall be as low as possible.
Region should be free from earthquake activity.
Note
It is observed that areas which were not showing any earthquake activity become seismically active after construction of a dam. Eg: Koyna Dam, Maharashtra.
The dam site should be easily accessible.
No objectionable minerals shall be present in nearby areas.
The dam site should be free from high silt inflow.
Typical Cross-Section of a Gravity Dam
Typical gravity-dam cross-section — crown at top, heel & toe at the U/S and D/S base corners, M.W.L./F.R.L. marked on the reservoir side, hydraulic height (F.R.L. to foundation) and structural height (crown to foundation) dimensioned, drainage gallery relieves uplift pressure by seeping water.
Length of dam is the distance from one abutment to the other abutment, along the axis of the dam.
Line of the U/S face of the dam, or line of the crown of the dam if the U/S face is sloping, is called the axis of dam, or base line of dam.
Drainage gallery is provided to relieve the uplift pressure by seeping water.
Forces on Gravity Dam
1. Weight of the dam — its main stabilising force. Total weight = W1 + W2 + W3 (sub-areas of the cross-section), acting along the C.G. of the cross-section.
γc — unit weight of dam material = 25 kN/m³
2. Water force — the main destabilising force. Tail-water depth helps in stability.
Weight resolved into sub-area components W₁, W₂, W₃ (stabilising, acting through the C.G. of each area); U/S hydrostatic pressure prism PH1 = ½γwH² acting at H/3 above the base (destabilising); tail-water pressure prism PH2 = ½γwH′² acting at H′/3 above the base on the D/S face (stabilising).
V1, V2, V3 denote the weight of the water resting on their respective pressure prisms, where the reservoir or tail water overlies a sloping face.
Note
The source page ends here, mid-list of forces on a gravity dam (weight and water force covered; uplift force and the remaining stability criteria follow in Part 7).