Geotechnical Engineering / Soil Mechanics
The situation where soil at shallow depth is poor: in order to transmit the load safely, depth of the foundation has to be increased so that the load could be safely transmitted. This is called deep foundation.
A pile is generally a small diameter shaft which can be driven or installed into the ground. Piles are generally used in groups to work as foundation.
Piles are used to provide resistance either through point bearing or through friction.
If the major contribution in resistance is due to point bearing, the pile is called point bearing pile; otherwise if major contribution is due to friction, the pile is called friction pile.
The best way of classification of a pile is based on the effect of installation of the pile on the soil: (a) displacement pile, (b) non-displacement pile.
If during installation, large volume of soil is displaced laterally or upwards, the pile is called displacement pile.
During installation, a displacement pile in loose sand densifies the sand up to a distance of 3.5D (D = dia of pile), leading to increase in shear resistance and hence increase in frictional resistance. In clays, larger displacement piles remould the clay up to a distance of 2D from the centre of the pile.
Piles used in compression, uplift (tension), and batter piles for lateral load resistance (e.g. under a retaining wall).
Load capacity of pile can be estimated by various methods: (1) static pile load formula, (2) pile driving formula, (3) pile load test, (4) co-relation with field test data.
Total ultimate capacity = point bearing + friction.
If Qpu ≫ Qf: pile is called point bearing pile. If Qf ≫ Qpu: friction pile.
(the ½BγNγ term is generally small compared to qNq for a slender pile, c=0 for sand)
K = lateral earth pressure coefficient (empirical, depends on pile material and relative density), δ = pile-soil friction angle.
| Pile material | δ | K, loose | K, dense |
|---|---|---|---|
| Steel | 20° | 0.5 | 1 |
| Concrete | ¾φ | 1 | 2 |
| Timber | ⅔φ | 1.5 | 4 |
Effective stress becomes constant after a particular depth (critical depth) due to the arching effect which exists in the case of sand — 15D for loose sand, 20D for dense sand (D = pile diameter).
For a layered profile with the critical depth boundary inside one layer:
x = the constant effective stress reached at the critical depth.
Due to boring condition, the value of K is very small as compared to that in the driven pile, and normally K is taken as 0.5 for calculation purpose, and δ is taken as φ. The point bearing resistance is taken approximately as half of the point bearing resistance as in the case of driven piles.
c at base of pile, Nc as per Skempton (Df/B > 2.5, Nc=9).
α = adhesion factor (adhesion between pile surface and clay), c = average c along the length of pile.
Static load formula is used only as a guide for load capacity estimation, but more reliance is placed on pile load test.
A 12 m long, 300 mm dia concrete pile is driven in a uniform deposit of dense sand. Water table is at great depth and is not likely to rise. Average dry density of sand is 18 kN/m³ and Nq=137. Calculate the safe load carrying capacity of a single pile. FOS=2.5, φ=40°.
Effective stress rises linearly to 108 kN/m² at 6 m (=20D for dense sand), then stays constant to the pile tip at 12 m.
δ = ¾×40° = 30° (concrete, driven, dense → K=2):
A 450 mm side square section concrete pile is 15 m long and is driven in a weak deposit of uniform clay. The laboratory UCS test on an undisturbed sample indicates an average UCS of 75 kN/m². Calculate the ultimate load capacity of pile. α=0.8.
Note that the point bearing resistance is very small as compared to the frictional resistance; hence piles in soft clay are friction piles (generally).
Determine the allowable load capacity of a 40 cm dia driven concrete pile through: loose sand 3 m (γ=16 kN/m³, φ=30°), soft clay 6 m (γsat=18 kN/m³, c=15 kN/m²), dense sand 5 m (γsat=20 kN/m³, φ=40°), water table at top of clay. Nq=160, γw=10 kN/m³.
| Depth | Effective stress &sigmā (kN/m²) |
|---|---|
| 3 m (base of sand) | 16×3 = 48 |
| 9 m (base of clay) | 48+(18−10)×6 = 96 |
| 14 m (pile tip) | 96+(20−10)×5 = 146 |
Qf1 (loose sand, K=1, δ=¾×30°=22.5°, avg σ=24):
Qf2 (soft clay, α=1, c=15):
Qf3 (dense sand, K=2, δ=30°, avg σ=121):
Piles are always used in groups. When a single pile is driven, there is uncertainty regarding the verticality of pile; hence at any place, minimum of 3 nos. of piles are used. However in case of bored piles, verticality can be easily ensured. Still, as per recommendation, we use minimum of 3 nos. of piles at a particular location.
When piles are used in group, the zone of influence of individual piles may overlap, and thus the load carrying capacity per pile in a group will be lesser than that when the pile is used alone. However if the spacing between the piles is more, the strength in group per pile may be equal to the single pile strength due to non-overlapping of the zone of influence.
In case of sand, if driving of pile leads to densification of sand, then the increase in strength due to densification may offset the loss of strength due to the overlapping of stress zones. Hence capacity of pile in group per pile may even be greater than the single pile strength.
Qug = group capacity of pile, n·Qu = summation of individual pile capacity.
Generally, in case of sand ηg>1, but we take ηg=1. In case of clays, ηg<1.
Minimum spacing: 2.5D → point bearing piles, 3D → friction piles, 2D → loose sand/filled deposits. In case of non-circular piles, diameter of circumscribing circle is taken as D for minimum spacing calculation.
The pile group is treated as an equivalent single block for the group failure check.
The coefficient on the perimeter (block friction) term is taken as 1, not the adhesion factor α — this represents soil-soil shearing around the outside of the block, not pile-soil adhesion.
In case of sand, the group capacity is generally greater than 1; hence we take the summation of individual pile capacity as the group capacity.
Design a square pile group to carry 400 kN load in clays with UCS of 60 kN/m² and α=0.6. Piles are of size 300 mm and length 6 m.
Single pile capacity (c = UCS/2 = 30):
Adopt 9 nos. of piles (3×3 arrangement).
Ultimate group capacity ≥ 400×FOS = 1000 kN:
However, the spacing between friction piles should be minimum of 3D = 3×0.3 = 0.9 m, and piles in clays can be treated as friction pile. Hence, minimum spacing between piles is treated as 0.9 m (governs over the 0.353 m from group capacity).
A 200 mm dia, 8 m long piles are used as foundation for a column in a uniform deposit of medium clay having UCS of 100 kN/m², α=0.9. There are 9 piles arranged in square pattern. Find the spacing between piles, neglect bearing.
In this problem the load is not given, hence to find the spacing we equate the summation of single pile capacities with the group capacity and calculate the spacing.
Single pile capacity (c = UCS/2 = 50, bearing neglected):
Group capacity (block perimeter, coefficient = 1 for soil-soil shearing):
Minimum spacing, however, should be 3D = 0.6 m, as it is a friction pile — this governs over the calculated 0.536 m.
Settlement of pile group is greater than settlement of individual piles for the same load per pile. This is because the zone of influence of a group of piles is greater.
When pile is driven in uniform deposit of clay: the equivalent load-transfer plane is taken at 2L/3 from the top, and the block below it disperses stress at 2:1.
When piles are driven into strong stratum through an overlying weak stratum: the effective load-transfer plane is taken at 2L2/3 into the strong stratum only.
In case of bored pile or end-bearing pile resting on firm stratum, the equivalent raft is located at the bottom of the pile directly.
B = smaller dimension of group in m. Sg = group settlement for the same load per pile. Si = individual pile settlement for the same load per pile, calculated from pile load test.
Pile load capacity confirmation is generally obtained using pile load test, because it is an in-situ testing. It is very useful for cohesionless soil.
Vertical pile load test is carried out to establish load-settlement curve and to obtain the allowable pile load capacity. Two tests are carried out: (1) initial test, (2) routine test.
Initial test is conducted on piles installed before the commencement of work at site; routine tests are conducted during the progress of work on certain % of piles that are actually going to be part of the foundation. Thus initial test is conducted on a test pile, and routine test is conducted on a working pile.
The safe load / allowable load on a single pile shall be the lesser of:
Ultimate capacity is calculated by the same procedure as discussed in plate load test (double tangent method).
Cyclic pile load test is conducted to determine the point bearing resistance and frictional resistance separately.
This formula is based on the penetration resistance during pile driving (an energy-balance argument): hammer of weight W falling height H strikes the pile, driving it down by Δ.
6 = FOS used. H = height of fall (cm). s = settlement per blow (cm), taken as average settlement for the last 5 blows for a drop hammer, or average of the last 20 blows of a steam hammer. c = empirical factor accounting for losses: c=2.5 cm for drop hammer, c=0.25 cm for single-acting steam hammer.
E = energy per blow (kJ), s = settlement per blow (mm).
The source page closes with a running list of related topics: vertical stress (Boussinesq & Westergaard assumptions, formula for stress calculation at a point due to point load & line load, Newmark's chart); stability of slope (Taylor's stability number); expansive soil & soil exploration; and a note on the GATE syllabus weighting across (1) Seepage, (2) Foundation, (3) Consolidation, (4) Shear strength, (5) Earth pressure, (6) Soil classification — all numerical-heavy.