Geotechnical Engineering / Soil Mechanics
In 2D flow conditions, the following assumptions are made:
For isotropic soil, kx = ky.
For steady, incompressible flow, the continuity equation in 2D is:
For isotropic condition (kx=ky), this reduces to:
Graphical solution of the Laplace equation gives two sets of orthogonal lines — flow lines and equipotential lines. Flow lines indicate the direction of flow; equipotential lines indicate the locus of points having equal total head.
Nf: number of flow channels = number of flow lines − 1. q: discharge between successive flow lines.
k = coefficient of permeability, H = head causing flow, Nd = number of equipotential drops = number of equipotential lines − 1.
Boundary conditions for a sheet pile flownet: the ground surfaces (upstream and downstream) are boundary equipotential lines; the sheet pile face and the impermeable layer are boundary flow lines.
Uplift pressure diagram along the dam base, obtained by reading pore pressure at each point (from the flownet's equipotential drops) and plotting it as an upward arrow — the enclosed pressure diagram gives the total uplift force.
Uplift force on the dam base = area under the pressure diagram, applied over the base area A.
The exit gradient is checked at the last (smallest) flow field near the downstream toe, where seepage force is most concentrated.
A downstream cutoff makes the last flow field larger (since flow must travel around the cutoff, spreading the same head loss over a bigger cell), which reduces the exit gradient. We provide both U/S and D/S cutoffs together so that chances of uplift pressure becoming excessive and chances of piping are both reduced.
Piezometric level at any point x under the dam can be read off the flownet by counting how many equipotential drops (out of Nd) have occurred up to x, and applying that fraction of H.
Confined flow: all four boundaries (upstream bed, sheet pile, downstream bed, impermeable rock) are known — the flownet's flow space is fully "confined" by known boundary conditions.
Unconfined flow (through an earth dam body itself): three boundary conditions are known (upstream face, base, downstream drain), but the top flow line (the phreatic surface, where pressure = atmospheric) is not known in advance.
As per Casagrande, flow lines and equipotential lines are two sets of parabolas having a common focus F (located at the toe drain). The top parabola is called the base parabola. A parabola has the property that the distance of any point on it is equidistant from the focus and the directrix.
Base parabola construction: point D on the upstream face (DC = 0.3·BC) is a known point on the parabola. From √(D²+H²) = D+s, the parabola parameter s is found; then any point (x,y) on the curve satisfies √(x²+y²) = x+s.
DC = 0.3·BC locates point D. Using the first equation, s is calculated; using the second, for various values of x, y can be calculated and the top flow line gets located. A slight modification is required near the entry point at the upstream face (the true entry doesn't follow the pure parabola exactly there).
At x = 0, y = s (the parabola intersects the y-axis at height s):
For the top flow line, total head = elevation head (since pressure = atmospheric everywhere on it, p = 0), hence dy/dx is the hydraulic gradient at x = 0, and hence the discharge per unit length inside:
Vertical intercepts between the points where an equipotential line intersects the top flow line are the same, because for the top flow line, total head = elevation head.
Dividing through by ky:
Substituting a transformed coordinate xt = x·√(ky/kx):
This is Laplace's equation again, in the transformed coordinate xt — so a standard (orthogonal, isotropic-style) flownet can be drawn on a transformed section.
The transformed section is obtained by modifying the horizontal dimension (scaling by √(ky/kx)) while keeping the vertical dimension intact.
Discharge computed on the original section using kx directly must equal discharge computed on the transformed section using keq:
s (in the transformed section) is found from the same base-parabola construction used above, applied to the transformed geometry:
A flow line bends (refracts) crossing the interface between two soils of different permeability, exactly like light bending at an optical interface — it bends toward the normal when entering the less permeable soil.
where α1, α2 are the angles the flow line makes with the normal to the interface in each layer.
Design criteria for a filter to be provided on the D/S side of a structure, to prevent erosion and piping.
Filter (coarser granular material) placed downstream of the protected soil, at the exit of the seepage path.
A fully penetrating well of r = 0.2 m pumps at a constant rate of 400 m³/hr from a confined aquifer of sand, thickness B = 40 m, porosity n = 0.25. How long will it take a pollutant to reach the well if introduced in the aquifer 100 m from it?
Radial flow toward the fully penetrating pumped well within the confined aquifer of thickness B.
q = Area × seepage velocity, with vseepage = vdischarge/n:
At x = 0 (well centre), t = 0 ⇒ C = 0. Integrating from x = 100 (pollutant entry) to x = 0.2 (well radius):
Dam cross-section with anisotropic foundation/embankment soil: kx = 8×10−7 cm/s, ky = 3.6×10−7 cm/s. (1) Estimate the seepage through the dam section. (2) If the number of equipotential drops up to point x is 3, and Nd = 18 total, find the pore water pressure at x.
Trapezoidal dam section on a pervious foundation, toe drain at F; point X within the section where pore pressure is sought.
D (transformed distance from the upstream face to the parabola focus F, per the drawn geometry) = 34.8 + 9.66 = 45.46 m, H = 14 m:
Head lost up to X = (3 drops out of 18) × total head H = 14 m, and X sits 6 m below the reservoir water surface in elevation: