Geotechnical Engineering / Soil Mechanics
Zero air void dry density is the maximum theoretical dry density at a particular moisture content.
Soil is to be excavated from a borrow pit; the borrow pit has density 1.75 g/cc and water content of 12%, Gs = 2.7. The soil is to be compacted such that water content of the compacted fill is 18% and γd = 1.65 g/cc. For 1000 m³ of fill, estimate: (1) quantity of soil to be excavated from the borrow pit, (2) amount of water to be added, (3) void ratio of soil in the borrow pit and in the fill.
Soil moves from the borrow pit (12% moisture) to the fill (compacted to 18% moisture, γd=1.65 g/cc), for a final fill volume of 1000 m³.
This same Ws = 1650 t of solids is what was excavated from the borrow pit and then recompacted — solids are conserved, only the water content and void ratio change between the two states.
Water added = (final water content − original water content) × Ws:
Fill: γd = 1.65 g/cc directly:
Borrow pit: γd,BP = γt / (1+w) = 1.75/1.12 = 1.5625 g/cc:
| Quantity | Value |
|---|---|
| Volume excavated from borrow pit | 1056 m³ |
| Water to be added | 99 m³ |
| Void ratio, borrow pit | 0.728 |
| Void ratio, fill | 0.636 |
Determination of water content is necessary in the case of fine-grained soil, because properties of fine-grained soil vary at different water content. Also, to determine γd, we need to measure the water content.
Water associated with a clay particle, from innermost to outermost: adsorbed structural water (very strongly attached), free water, and weakly bonded (hygroscopic) water at the periphery.
Oven-dried soil does not have hygroscopic moisture, but air-dried soil does have hygroscopic water.
Soil dried at 105–110°C for 24 hours; above this temperature range, structural (adsorbed) water — the water of crystallisation — is also lost, which would bias the result.
If organic fraction is significant, heating temperature should be 60–80°C (a hotter oven would burn off organic matter along with the water).
Pycnometer method (moist-soil variant): four weighings — empty jar (W1), jar+moist soil (W2), jar+moist soil+water filled to the mark with air sucked out (W3), and jar filled with water alone to the same mark (W4).
Finding Gs via volume of solids:
Finding water content:
Pycnometer method can also be used to find Gs. It gives results quickly, but can be used only if we already know the Gs value. It is more suitable for cohesionless soil, in which sucking out of air is easy.
Same setup with oven-dried soil instead of moist soil — used to find Gs directly, since W2 is now the dry solids weight.
using W4 = W3 − Ws + Vs·γw, which gives (W4−W3) = (W2−W1) = Vs·γw.
We report the Gs value at 27°C. Hence, if laboratory temperature is different, Gs is calculated at laboratory temperature and converted to 27°C, using the fact that the unit weight of the soil solid itself doesn't change with temperature:
A field method.
This method is used for soil which is hygroscopic in nature.
C2H2 = acetylene.
Moisture content is determined on the basis of the number of moles (i.e. partial pressure exerted by acetylene), but this method gives water content in terms of total weight (Wt), not the usual Ws-based water content — from which the usual water content can then be calculated.
This relation is inverted to find w (the usual water content, Ww/Ws) from the calcium-carbide test's measured wt.
Listed among the standard water content determination methods (source lists it without further detail on this page).