Transportation Engineering / Highway Engineering
Traffic volume will increase on the road each year. Different vehicles have different weights, and wheel loads are applied over different portions of the pavement, not a single location. Thus, three effects are considered when we compute the design traffic or design load.
We estimate the number of commercial vehicles that are going to utilize the road over the design life.
The cumulative traffic obtained above needs to be modified for:
All vehicles don't move on the same path, thus all vehicles don't load the pavement at the same location. Therefore we only take a certain % of cumulative traffic as design traffic — the IRC recommendation for this is the lateral distribution factor (LDF).
| Carriageway type | LDF |
|---|---|
| 1 — Single lane | 1.00 |
| 2 — Double lane (two-lane, undivided) | 0.75 |
| 3 — 4-lane single carriageway | 0.40 |
| 4 — 4-lane divided carriageway (per direction N₁, N₂) | 0.75 × max(N₁, N₂) |
| 5 — 8-lane divided carriageway (per direction N₁, N₂) | 0.40 × max(N₁, N₂) |
| 6 — 3-lane single carriageway | 0.60 |
Design traffic for a single lane = N × LDF.
Lane-distribution schematics for single, double, and 4-lane single carriageways — more lanes spread the cumulative traffic thinner per lane, lowering LDF.
In this case, design is governed by the number of repetitions of standard axles. An 80 kN single axle load is taken as the standard axle load (8200 kg).
Axles that are not equal to 80 kN are converted to an equivalent number of standard axles using the equivalent axle load factor (EALF). The repetition of a given axle load is multiplied by its respective EALF to obtain the equivalent number of 80 kN axle-load repetitions.
where n = number of applications of loads of the ith group.
| Axle load | Repetitions | EALF | Std. axles |
|---|---|---|---|
| 40 kN | 80 | (40/80)⁴ = 1/16 | 5 |
| 80 kN | 100 | (80/80)⁴ = 1 | 100 |
| 160 kN | 20 | (160/80)⁴ = 16 | 320 |
| Total | 425 std. axles | ||
| Wt (kN) | Freq. | Midpoint | EALF | ESAL |
|---|---|---|---|---|
| 0–40 | 50 | 20 | 1/256 = 0.0039 | 0.1953 |
| 40–80 | 250 | 60 | 0.3164 | 79.10 |
| 80–120 | 400 | 100 | 2.4414 | 976.56 |
| 120–160 | 25 | 140 | 9.3789 | 234.47 |
| Total (725 veh/day) | 1290.32 /day | |||
ESWL (traffic) in a year ≈ 0.47 MSA