Transportation Engineering / Traffic Engineering

TRANS-04C Speed-Delay & O&D Studies

Converted from handwritten notes — TRANSPORT 04.pdf, pages 14–20

Doc No.TRANS-04C
StatusDraft — Awaiting Review
Converted03-08-2026
Approved—

Speed and delay study

Gives information such as the amount, location and causes of delay in the traffic stream. Analysis is done over a longer distance than a single point, so — unlike spot speed study — it is possible to determine the density of traffic. Results are used in planning remedial measures at specific locations.

Methods: floating car method, licence plate method, interview technique, photographic technique.

Floating car (moving-observer) method

Suitable for two-lane traffic; requires a minimum of four observers. The test vehicle runs the section of concern (say N→S) in both directions — once with the stream, once against it.

N S — concern direction N→S test vehicle:t𝑤 (with stream, S→N)tỌ (against stream, N→S)

Floating car method — test vehicle traverses the section in both directions.

x
No. of vehicles in the N-S direction while the test vehicle moves S→N.
a
No. of vehicles overtaking the test vehicle while it moves N→S.
b
No. of vehicles overtaken by the test vehicle while it moves N→S.
ta, tw
Journey time of the test vehicle against the stream (N→S) and with the stream (S→N) respectively.
y=a−b q=x+ytw+ta q → volume of traffic in the N→S direction t¯=tw−yq t̄ → average journey time of traffic in the N-S direction Vmean=Lt¯ Mean journey (space mean) speed running time=t¯−td2 running speed=Lrunning time
Worked example

Length of road stretch L = 0.5 km, speed of test vehicle v = 20 kmph. Find the average speed of the stream, traffic flow and density from the three sample runs below.

Samplexaby=a−bq (veh/hr)
11071074−64860
21132541−161940
330155+10800

ta = tw = L/v = 0.5/20 = 1/40 hr = 1.5 min, so tw+ta = 1/20 hr, and q = (x+y)⋅20.

q (veh/hr)t̄ (hr)v̄ (kmph)k = q/v̄ (veh/km)
8600.09945.03170.97
19400.033215.06129
8000.013437.3921.39
⚠
Two source corrections

Sample 2's density: source first wrote 169.28, crossed it out, corrected to 129 — used here. Sample 3's t̄: the handwritten digit is unclear (looks like 0.0125, which doesn't reproduce the stated v̄=37.39/k=21.39); back-solved from k=q/v̄ as t̄=L/v̄≈0.0134, used above — flagging rather than re-deciphering the source repeatedly.

v̄₁=5.03 kmph, v̄₂=15.06 kmph, v̄₃=37.39 kmph

Worked example

A student riding a bicycle on a 5 km one-way street takes 40 min to reach home, stopping for 15 min during the ride. 60 vehicles overtook the student (assume the student overtook none). 45 vehicles crossed the student while stopped. Find the speed of the vehicle stream.

q=4515/60=180 veh/hr tw=25 min,  y=a−b=60 t¯=tw−yq=2560−60180=112 hr avg velocity=Lt¯=5 km1/12 hr=60 kmph

Speed of the vehicle stream = 60 kmph

Volume & travel time in both directions simultaneously

qNS=x1+(a2−b2)t1+t2 qSN=x2+(a1−b1)t1+t2 t¯NS=t2−a2−b2qNS t¯SN=t1−a1−b1qSN
⚠
Possible subscript slips in source

The source writes qSN's denominator as “b1+t2” and t̄SN's numerator as “a2−b1”. By symmetry with the N→S formulas (same t1+t2 denominator; a and b sharing one direction's subscript), these look like b↔t and 2↔1 handwriting slips; the symmetric forms are used above — flagging rather than guessing further.

Origin and destination (O&D) studies

An O&D study determines the number, origin and destination of traffic in the concerned study zone — giving the actual direction of travel, route selection and trip length. It helps in planning new highways, improving existing services, and designing mass transit systems.

Methods of collecting O&D data
Road-side interview method, licence plate method, return post-card method, tag-on-car method, home interview method.
Presentation of O&D data
Desire lines (straight lines directly connecting origin and destination, thickness proportional to the amount of traffic), pie chart, contour lines.