Transportation Engineering / Highway Engineering
It involves two steps: (1) elimination of crown, (2) rotation to attain full superelevation.
It has two methods:
Crown elimination: rotating the whole section about the existing crown vs. shifting the crown line toward the inner edge first.
| 1 — Rotation @ crown | 2 — Shifting of crown |
|---|---|
| This method is usually adopted. | Drainage problem, excessive negative cant on the outer edge. |
| Drainage problem on the outer side. |
It has two methods: (1) rotation @ centreline, (2) rotation @ (inner) edge.
| 1 — Rotation @ centreline | 2 — Rotation @ (inner) edge |
|---|---|
| Earthwork due to cutting and filling will be balanced. | Earthwork is needed for filling. |
| Drainage problem on flat terrain and cutting on the inner edge. | No drainage problem for flat surface. |
| Generally adopted in case of embankments. | Elevation of centreline is increased. |
| No change in the elevation of the centreline. |
A transition curve is provided between straight and circular portion such that radius of curve varies along the transition curve from infinite to R0.
At the beginning of the transition curve, the outer leg of camber section is made horizontal. At the end of transition curve, full superelevation (e) is attained and it remains constant throughout the circular curve.
If no transition curve is provided, ⅔ of final superelevation is attained in the straight portion only, and the remaining ⅓ is achieved in the circular curve.
Ruling minimum radius:
Absolute minimum radius:
Calculate absolute minimum radius and ruling minimum radius for national highway.
(Using NH ruling/minimum design speeds of 100/80 kmph, and e+f = 0.22.)