Transportation Engineering / Highway Engineering

TRANS-03E Overtaking Sight Distance and Overtaking Zone

Converted from handwritten notes — TRANSPORT 03.pdf, pages 21–24

Doc No.TRANS-03E
StatusDraft — Awaiting Review
Converted09-08-2026
Approved—

Overtaking sight distance (OSD)

Two-lane two-way road. Vehicle A has been moving after reducing its speed to vb, and is looking for an opportunity to overtake. At some instance it sees an opportunity, but it takes some reaction time for it, and during this time it moves by distance d1.

A B vb B′ A′ C s vb×T s d₁=vbt₁ d₂ d₃=vT

Overtaking manoeuvre: A accelerates around B into the opposing lane and returns, while an oncoming vehicle C (travelling at design speed v) approaches during the same manoeuvre time T.

OSD OSD=d1+d2+d3

t = 2.0 sec (overtaking reaction time).

d₁ — distance during reaction time d1=vb×t

Vehicle A needs to maintain a minimum gap of s from vehicle B:

Minimum spacing s=0.7vb+6

Vehicle A can stop the vehicle if it can see that vehicle B is suddenly stopped, in reaction time = 0.7 sec, as the driver would be more attentive.

If vehicle A sees the opportunity, it will accelerate into the different lane and again come back into the original lane, maintaining a space s with vehicle B, which by this time has moved ahead by distance vb×T. T = overtaking time.

d₂ — distance during overtaking manoeuvre d2=vbt+2s=vbT+12aT2 T=4sa
Speed (kmph)a (m/s²), by IRC
800.72
1000.53

If safe gap before overtaking (s1) and after overtaking (s2) are different:

d2=vbt+s1+s2=vbT+12aT2 T=2(s1+s2)a

If vb = v − 4.5 m/s (= v − 16 kmph):

d₃ — oncoming vehicle d3=v×T

OSD for two-lane two-way traffic = d1 + d2 + d3. OSD for divided highway or roads with one-way traffic regulation: OSD = d1 + d2. Effect of gradient is not considered while calculating OSD.

Worked examples — OSD

Two-way traffic road

Design speed = 65 kmph, speed of slower vehicle = 40 kmph, average acceleration = 0.92 m/s². Find OSD and indicate the details of OSD.

65 kmph = 18.06 m/s, 40 kmph = 11.11 m/s.

d1=vb×t=11.11×2=22.22 m s=0.7×11.11+6=13.77 m T=4×13.770.92=7.739 sec
d2=2s+vbT=27.54+85.98=113.52 m d3=v×T=139.68 m

OSD = d₁ + d₂ + d₃ = 275.42 m

22.22+113.52+139.68=275.42 — matches source.

With different safe gaps s₁=14 m, s₂=16 m (same v, vb):

T=2(14+16)0.92=8.07 sec d2=s1+s2+vbT=119.72 m d3=145.74 m

OSD = 287.64 m

Overtaking zone

An overtaking zone is provided when OSD is not available throughout the length of the highway.

OSD OSD OSD l

Overtaking zones (dashed sight lines, each ≥ OSD) separated by non-overtaking stretches of length l along the highway profile.

l=min3 OSD,  max5 OSD