Transportation Engineering / Surveying
Measurements of angles and distances are made in various surveying operations and, irrespective of all precautions exercised, there are possibilities of errors creeping in. Hence it is almost impossible to determine the True Value (TV) of these quantities — so instead of TV, the Most Probable Value (MPV) is used.
Mistakes are errors resulting from carelessness, inexperience and poor judgement. By adopting careful work and standard procedures, mistakes can be eliminated.
These are errors which follow a definite mathematical or physical law. Ex. expansion of steel tape, sag error.
Accidental error occurs due to a combination of causes and is beyond the control of the surveyor. It is observed that accidental errors tend to cancel out when a large number of observations are made, because there is an equal chance of them being positive or negative.
They are therefore also known as compensating errors, but this compensating effect is partial — hence some accidental error is always left over. They obey the law of chance and can be analyzed by the theory of probability.
Normal probability distribution curve — random errors plotted against their probability of occurrence: symmetric about zero, single peak (small errors most frequent), tails thinning out (large errors rare).
When random errors are plotted against their probability of occurrence, we get the normal probability distribution curve above.
Error / most probable error / residual / variation — these terms are used interchangeably.
v = measured value − most probable value (variation)
Standard error of a single observation is equal to standard deviation — the two terms are used in place of each other.
The error which has an equal chance of being above or below the true error.
When the error is more than emax, it is treated as a mistake.
In a triangular survey, the following four measurements are made by a group with the same instrument: 75°42′10″, 75°41′50″, 75°41′40″, 75°42′0″. Calculate (1) standard deviation, (2) std. dev. of mean, (3) most probable error of single observation, (4) most probable error of mean, (5) variance, (6) max. error.
(arithmetic mean of the four readings)
v₁ = +15″, v₂ = −5″, v₃ = −15″, v₄ = +5″ ⇒ ∑v² = 500
σ = ±12.91″
σm = σ/√n = ±6.4″
e = ±0.6745σ = ±8.71″
em = ±0.6745σm = ±4.35″
emax = ±3.29σ = ±42.47″
Weight of a quantity is a measure of the relative trustworthiness of the set of observations. Greater the precision, greater the weight. Weight is expressed in numbers.
Weight is inversely proportional to variance, and inversely proportional to (standard error)².
Weight of a quantity measured under similar conditions is assigned in direct proportion to the number of times readings are measured. Weight of a line is inversely proportional to the length of the line.
Sometimes weight is allocated by personal judgement depending on the prevailing field conditions — lesser weight is allocated for measurement done in unfavourable conditions than measurement done in favourable conditions.
A₁ = 40°20′20″, w = 2 A₂ = 40°20′30″, w = 3
A₁ = 40°20′20″, w = 1 A₂ = 40°20′30″, w = 1
A₁ = 40°, w₁ = 2 A₂ = 20°, w₂ = 3
A₁+A₂ = 60° and A₁−A₂ = 20°, both with:
A = 30°, w = 2 ⇒ 3A = 90°
A = 30°, w = 2 ⇒ A/3 = 10°
A = 40°, w = 2 ⇒ 2A = 80°, w = 1/2
A + B = 70°, w = 2 ⇒ −A − B = −70°, w = 2
A + B = 70°, w = 2 ⇒ 180° + (A+B) = 250°, w = 2 180° − (A+B) = 110°, w = 2
Worked application of these weighted-observation formulas continues in SURV-12B.