Transportation Engineering / Surveying

SURV-09C Setting Out a Simple Circular Curve — Peg Intervals and Linear Methods

Converted from handwritten notes — SURVEYING 09.pdf, pages 11–19

Doc No.SURV-09C
StatusDraft — Awaiting Review
Converted09-08-2026
Approved—

Setting out a simple circular curve

Setting out a curve is the process of locating various points along the length of curve at equal and convenient distances. The distance between two successive points is called the peg interval.

As it is difficult to set out the peg interval along the arc, it is done along the chord. Generally the peg interval is 20 m / 30 m; for sharp curves it may be reduced.

Let the chainage of the point of curve T₁ be m + n (that is, m chains + n links). Then the first point on the curve will be at chainage (m + 1) chain. Therefore, to make the first point on the curve fall at a full station, the first chord will be a sub-chord. All other chords, except possibly the last, will be full chords.

Worked example — peg interval layout

Example

Chainage of T₁ = 1545 m, length of curve l = 540 m, peg interval = 30 m.

Chainage of T₂ = chainage of T₁ + l = 1545 + 540 = 2085 m

To make the first point on the curve fall at a full station, the next multiple of 30 m above chainage 1545 is selected: 1545 / 30 ≈ 51.5 ⇒ 52 × 30 = 1560 m

Length of first sub-chord = 1560 − 1545 = 15 m

No. of full chords=540−1530=17.5

Hence, 17 full chords.

1560 + 17 × 30 = 2070 m

Length of last chord = 2085 − 2070 = 15 m

T₁ 1545 m 1560 m 15m 1590 m 30m 1620 m … point 3 … 2040 m 2070 m 30m T₂ 2085 m 15m l = 540 m

Peg layout: first and last chords are sub-chords (15 m each) so intermediate points fall on full 30 m stations from 1560 m to 2070 m.

Methods of setting out

Methods of setting out a simple circular curve can be classified as:

  1. Linear method — using chain / tape
  2. Angular method — using theodolite, with or without chain

Linear: offsets from long chord; perpendicular offsets from tangent; radial offsets from tangent; successive bisection of arc; offsets from chord produced.

Angular: Rankine method; two-theodolite method; tacheometric method.

1. Linear methods

(a) Offsets from long chord

T₁ T₂ M O₀ P P′ x Oₓ R R O

Offset Oₓ at distance x from the mid-point of the long chord: measured up from the long chord to the curve.

Ox=OC−OG
OC=R2−x2,OG=R−O0
Ox=R1−x2R21/2−R−O0

Expanding by the binomial series and retaining first-order terms:

Ox=R1−x22R2−R+O0
Ox=O0−x22R

(b) Perpendicular offsets from tangent

x T₁ P′ Oₓ P R R O

Perpendicular offset Oₓ from the tangent at distance x from T₁.

Ox=OT1−OC=R−R2−x2=R−R1−x22R2
Ox=x22R

(c) Radial offsets from tangent

T₁ x P′ P Oₓ O R

Radial offset Oₓ measured radially from centre O out to the curve point P, along OP′ extended.

Ox=OP′−OP=R2+x2−R
Ox=x22R

In this method, knowledge of the centre of the curve is mandatory.

(d) Successive bisection of arc

B A D C F E T₁

Each successive bisection halves the deflection angle: T₁B bisects Δ, T₁D bisects Δ/2, T₁F bisects Δ/4.

AB=R1−cosΔ2 CD=R1−cosΔ4 EF=R1−cosΔ8

(e) Offsets from chord produced

This is the best method for setting out long curves by linear methods when a theodolite is not available.

T₁ a b c₁ c₂ O₂

Each successive point is set out from the line joining the previous two points, produced, at a small perpendicular offset.

O1=C122R
O2=C2δ1+δ2=C2C12R+C22R
O2=C2C1+C22R
On=CnCn+Cn−12R
✎
Flagged for review

In the intermediate derivation step for O₂ in the source, the second term is written with a denominator "2R₂" (i.e. a stray subscript 2 on R) rather than "2R". Since this is a single simple curve there is only one radius R, and the boxed final result correctly simplifies to O₂ = C₂(C₁+C₂)/2R, matching the standard formula. The intermediate line appears to be a slip of the pen and has not been silently corrected — reproduced faithfully above except that the final line is shown with the consistent single R.