Transportation Engineering / Surveying
Simple levelling is used for determination of difference of elevations between two points which are close to each other, such that only one setting of instrument is sufficient. The instrument need not be in line with the end stations.
Simple levelling — the instrument, set off the line AB, reads B.S. on the bench mark A and F.S. on B.
RL of the instrument station is never determined. The staff should be held vertical.
Rocking of staff — the staff is waved towards and away from the line of sight to check verticality.
To ensure the verticality of staff, the staff is waved towards and away from the line of sight — this process is called rocking of staff. While doing this process, the smallest reading should be taken.
Very intense sunshine causes air close to the ground to shimmer; hence avoid staff readings less than 0.5 m.
A level field book / level book is used for booking or reducing the levels of various points. There are two methods of reducing levels: (1) Height of Instrument method (H.I. method, or collimation method), and (2) Rise and fall method.
The following consecutive readings are taken on a continuous sloping ground with a 4 m staff: 0.780, 1.535, 1.955, 2.985, 3.480, 1.155, 2.365, 3.640, 0.935, 1.630, 2.545. The reduced level of the first point A was 100. Rule out a page of level field book and enter the above readings; calculate the RL by both methods.
| Station | B.S. | I.S. | F.S. | H.I. | R.L. | Remark |
|---|---|---|---|---|---|---|
| A | 0.780 | 100.780 | 100.000 | B.M. | ||
| B | 1.535 | 100.780 | 99.245 | |||
| C | 1.955 | 100.780 | 98.825 | |||
| D | 2.985 | 100.780 | 97.795 | |||
| E | 1.155 | 3.480 | 98.455 | 97.300 | C.P. | |
| F | 2.365 | 98.455 | 96.090 | |||
| G | 0.935 | 3.640 | 95.750 | 94.815 | C.P. | |
| H | 1.630 | 95.750 | 94.120 | |||
| I | 2.545 | 93.205 | ||||
| ∑ | 2.870 | 9.665 |
Continuous sloping ground with two changes of instrument setup (change points E and G).
| Station | B.S. | I.S. | F.S. | Rise | Fall | R.L. | Remark |
|---|---|---|---|---|---|---|---|
| A | 0.780 | 100.000 | B.M. | ||||
| B | 1.535 | 0.755 | 99.245 | ||||
| C | 1.955 | 0.420 | 98.825 | ||||
| D | 2.985 | 1.030 | 97.795 | ||||
| E | 1.155 | 3.480 | 0.495 | 97.300 | C.P. | ||
| F | 2.365 | 1.210 | 96.090 | ||||
| G | 0.935 | 3.640 | 1.275 | 94.815 | C.P. | ||
| H | 1.630 | 0.695 | 94.120 | ||||
| I | 2.545 | 0.915 | 93.205 | ||||
| ∑ | 2.870 | 9.665 | 0 | 6.795 |
Rule for rise/fall: if B.S. < F.S. at a change point, ground is falling; if B.S. > F.S., ground is rising. For example, at B: 1.535 − 0.780 = 0.755 (fall).
All three checks agree at −6.795.
Given a set of levelling observations with some entries missing (illegible / crossed out in the source), the missing readings are recovered using the arithmetic check ∑B.S. − ∑F.S. = Last R.L. − First R.L. = ∑Rise − ∑Fall.
| St. no. | B.S. | I.S. | F.S. | Rise | Fall | R.L. | Remark |
|---|---|---|---|---|---|---|---|
| 1 | 3.125 | 124.180 | B.M. | ||||
| 2 | 2.265 | 1.800 | 1.325 | 125.505 | T.P. | ||
| 3 | 2.320 | 0.055 | 125.450 | ||||
| 4 | 1.920 | 0.400 | 125.850 | ||||
| 5 | 1.040 | 2.655 | 0.735 | 125.115 | T.P. | ||
| 6 | 1.620 | 3.205 | 2.165 | 122.950 | T.P. | ||
| 7 | 3.625 | 2.005 | 120.945 | ||||
| 8 | 1.480 | 2.145 | 123.090 | T.B.M. | |||
| ∑ | 8.05 | 9.14 | 3.870 | 4.960 |
All three checks agree at −1.09, confirming the recovered readings.
In the source (page with the "missing data" table), the fore-sight entry at station 2 (1.800) was originally written, struck through, and re-entered via an arrow — the struck-through original digits are illegible in the scan. The value 1.800 shown here is the one written after correction and is consistent with the arithmetic check, but please confirm against your original sheet that no earlier different value should be preserved instead.