Field work in chain survey

  1. Reconnaissance — a preliminary survey / inspection of the area to be surveyed, to get some idea of the terrain and identify the principal features of the ground. It enables the surveyor to decide upon the best possible arrangement of triangles.
  2. Marking of station — after completion of the reconnaissance survey, the best suitable positions of the main survey stations are marked on the ground, such that they can be easily identified afterwards if required.
  3. Running of survey lines — survey lines are run to measure the distance between the main stations and to locate the adjacent detail by taking offsets.
  4. Taking offset — by taking a perpendicular / oblique offset.
Note The maximum length of offset depends upon: (1) accuracy desired, (2) nature of the ground, (3) scale of plotting.

The degree of accuracy of the offset depends on: (1) scale of plotting, (2) length of offset, (3) importance of the detail for which the offset is taken.

Obstacles in chaining

Case 1 — ground about the chaining is possible

Ex. pond, small bend in a river, building.

pond A B C D

Equal perpendiculars are erected at C and D; CD (measured directly, parallel to AB) closes the detour. AB = AC + CD + DB.

Case 2 — ground about the chaining is not possible

river A B C D E E, D horizontal

Perpendicular AD is erected at A (through C); sighting from C to B and marking E on the opposite side of C such that EC = CB makes ▵ACB ≅ ▵DCE (right angles at A and D, vertical angles at C, EC = CB) ⇒ ED = AB, measured entirely on the near bank. Verified to scale here: ED = 140 = AB exactly.

Recording measurement

A B C 10 m tree

Field detail (a tree, offset 10 m from the chain line at station B) is booked in a double-line survey book; booking starts from the bottom of the page and proceeds towards the top.

Cross-staff survey

A special type of chain survey used to locate the boundary of a field, in order to calculate the area of the field. During this survey, the area is plotted on a suitable scale.

Chainage = 0 Ch. 100 20 Ch. 150 30 Ch. 200 25 Ch. 250 15 Ch. 300

Offsets to the field boundary are recorded against chainages along a single chain line; each plotted boundary point sits at its own recorded offset, perpendicular to the line, opposite its own chainage.