Broad-Crested Weir — Discharge Derivation

p1γ+H+V122g=p2γ+(h−3)+V222g

V₁ = Q/(L(α+H)) — approach velocity head, neglected.

V2=2g(H−h)
Qth=h⋅L2g(H−h),  Qactual=CdhL2g(H−h)

In broad-crested weir, flow depth adjusts itself to have maximum discharge ⇒ dQ/dh = 0.

ddh(hH−h)=0=−h2H−h+H−h
h=2H3
Q=Cd2H3L2g(H−2H3)=Cd23HL2gH3
Q=1.7CdLH32,  Cd≈0.85−1.2
V222g=H+ha−h⇒V2=2g(H+ha−h)
Q=L×h2g(H+ha−h)

For Qmax: dQ/dh = 0.

H+ha−h−h2H+ha−h=0
2(H+ha−h)=h⇒h=23(H+ha)
Q=CdL×23(H+ha)×2g(H+ha−23(H+ha))
Q=1.7CdL(H+ha)32

(H + ha) = height of TEL above broad-crested weir.

Discharge Sensitivity to Head Error

Q∝H32  for sharp-crested weir
Q∝H52  for triangular weir
Q∝H32  for broad-crested weir
dQQ×100=n×(dHH)×100

For infinitesimal change (1–2%).

Q2−Q1Q1×100=% change in discharge

For large changes.

Flow Through Orifice

H a vena contracta Cc·a

Small (sharp-edged) orifice — jet contracts to the vena contracta (area = Cc·a) just downstream of the opening

Q=Cda2gH,  Cd=0.61 –  0.62
p1γ+V122g+z1=p2γ+V222g+z2
V2=2gH
Qth=Cca2gH
Qactual=(Cv2gH)(Cc⋅a)=CvCc2gH⋅a
Qactual=Cd2gHa

Cv → actually accounts for the losses (coefficient of velocity), distinct from Cc (coefficient of contraction).

Finding Cv from Jet Trajectory

H x y Cv√(2gH)

Projectile motion of the emerging jet, measured from the vena contracta

s=ut+12at2,  x=Vt,  y=12gt2
x2y=V2t212gt2=2V2g
V=Cv2gH⇒x2y=4Cv2H
Cv=x24yH

Simultaneous Release from Two Orifices at Different Heads

H₁ H₂

Two orifices at heads H₁, H₂, jets released at the same instant — find where the trajectories meet

x1=x2,  y1=y2+(H2−H1)
GVF:  Cv2gH1t1=Cv2gHt2
H1t1=H2t2

Equation (A).

y1=12gt12,  y2=12gt22
y1−y2=g2(t12−t22)=H2−H1

Equation (B). From (A) & (B), find t₁ & t₂.

x1=x2=Cv2gH1t1

Proportional (Sutro) Weir

a L x secⁿ

Proportional weir shape gives Q linear in (H − a/3), for constant-Cd flow measurement over a wide head range

Q=K(H−a3),  K=CdL2ga
2xL=1−2πtan−1(ya)

Cd = 0.6 – 0.65.

Worked Examples

1. Cipoletti Weir — Effect of Approach Velocity

A Cipoletti weir discharges water with a head over the crest of 250 mm. If the head due to velocity of approach is 0.01 m, what will be the excess % age flow when corrected for velocity of approach as compared to when not corrected?

Q2=23CdL[(H+ha)32−ha32],  Q1=23CdLH32
Q2−Q1Q1×100=(H+ha)32−ha32−H32H32×100
=5.26 % ↑
Note If we consider the velocity of approach, we will not have a direct solution for discharge:
Q=23CdLeff2g[(H+(QL(α+H))212g)32−((QL(α+H))212g)32]

To solve this, we start by neglecting the velocity of approach & calculate Q. Use this Q to calculate RHS of the above equation & from this calculate LHS & continue till LHS = RHS.

2. Two Orifices, Equal Discharge — Depth Ratio

2 small orifices A & B of diameter 1 cm & 2 cm resp. are placed on the side of a tank at depths of h₁ & h₂ below the liquid surface. If the discharges to the 2 orifices are equal, find the ratio of h₁ & h₂, assuming constant Cd value.

QA=QB⇒π4d12h1=π4d22h2
4h1=h2⇒h1h2=116

3. Sharp-Crested Weir — Approach Velocity Accuracy Limit

In a sharp crested weir, H = 20 cm. If Q is to be measured within 3% accuracy, calculate what approach velocity can be neglected.

Q2=C[(H+ha)32−ha32],  Q1=CH32
Q2−Q1Q1×100=3
(H+ha)32−ha32(ha+H)32=0.03
0.97(H+ha)32=ha32⇒H+ha=1(0.97)23ha
H=0.2 m,  ha=Va22g=4.5×10−3 m
Va=0.3 m/s

Thus, if approach velocity is less than 0.3 m/s, it can be neglected.

4. Tank Filling via Orifice — Rate of Rise

A tank (plan area 1 m × 1 m) has an orifice of diameter 0.1 m, Cd=0.65, in its base, at a depth of 4 m. The tank receives Q₀ that would maintain a constant depth of 4 m in the tank. (1) When the tank is empty and water supply just enters the tank, find the rate of rise in height. (2) When the water level in the tank is 2 m, find the rate of rise in height.

4m Area 1m×1m orifice, dia 0.1m, Cd=0.65
Q0=0.045 m³/s=Cdπ4d122gH
Rate of rise (initially)=0.045 m³/s1 m²=0.045 m/s

Under equilibrium depth condition, rate of inflow = rate of outflow.

Q0,1=Cdπ4d122gh
Net accumulation=Q0−Q0,1
rate of rise=Q0−Q0,1A

At h=2m: substitute into the outflow formula to get Q0,1 at that instant, then evaluate the rate.