Converted from handwritten notes — Irrigation 04.pdf, pages 61–66 of 167 — Part 4 of 8
Doc No.IRR-04
StatusDraft — Awaiting Review
Converted28-07-2026
Approved—
Irrigation Requirement of Crops
1. Consumptive Irrigation Requirement (CIR)
Amount of irrigation water required to meet the evapotranspiration needs of the crop during its full growth.
Cu — consumptive use of crop
Re — effective rainfall
Note CIR = Ws
2. Net Irrigation Requirement (NIR)
Amount of irrigation water required to be delivered to meet the evapotranspiration needs as well as other needs such as leaching and pre-sowing water.
Note NIR = Wu
3. Field Irrigation Requirement (FIR)
Amount of water required to meet NIR plus water losses (application losses).
Note FIR = Wf
4. Gross Irrigation Requirement (GIR)
Amount of water to be released from the river/reservoir.
5. Consumptive Use / Evapotranspiration (Cu)
It is defined as the amount of water needed to be delivered to the field to meet the water losses through evapotranspiration in any specified time. It has two elements:
Transpiration — only a small portion of the water absorbed by the roots is retained in the plants, and the rest of the absorbed water, after performing its task, escapes to the atmosphere. This process is called transpiration.
Evaporation — water from the adjacent soil passes into the atmosphere in the form of vapour.
Factors Affecting Consumptive Use of Water
Temperature ↑ → Cu ↑
Wind velocity ↑ → Cu ↑
Relative humidity ↑ → Cu ↓
Day hours ↑ → Cu ↑
Intensity of sunlight ↑ → Cu ↑
Type of crop
Soil moisture depletion
Potential & Actual Evapotranspiration
Potential Evapotranspiration (PET)
If sufficient moisture is always available to completely meet the needs of vegetation fully covering the area, the resulting evapotranspiration is called PET. PET depends on climatic factors.
Actual Evapotranspiration (AET)
The real evapotranspiration occurring in a specific situation is called AET. If the water supply to the plant is adequate, the soil moisture will be at field capacity, and AET = PET.
AET/PET stays at 1 until about 50% of available moisture is depleted, then falls toward 0 at the wilting point (φ); the decline is steeper for sand than for clay.
Note
The decrease in the ratio of AET/PET with available moisture depends on the type of soil. Capillary water is large in the case of clay, so if water content falls below field capacity, even then water can be very easily taken up by plants — so AET remains close to PET for longer in clay than in sand.
Methods of Determining Cu
1. Blaney–Criddle Equation
Cu — monthly consumptive use (cm)
K — crop factor / consumptive use coefficient for the growing season, determined by experiments for each crop under the environmental conditions of the particular area
t — monthly mean temperature (°C)
P — monthly % of annual daylight hours that occurs during that period
Note
This method does not account for humidity, wind velocity and elevation from MSL.
2. Hargreaves Class A Pan Evaporation Method
It is a standard pan having diameter 1.2 m and depth of 25 cm. A water depth of 5–7.5 cm is maintained during the evaporation.
K — consumptive use coefficient; it is different for different crops, and different for the same crop located at different places.
3. Penman's Equation
It is a complicated theoretical equation based on the energy balance and mass transfer approaches for computation of transpiration and evaporation respectively.
Worked Example
Worked Example
Determine evapotranspiration and irrigation requirement of wheat if ηa = 65% and ηc = 70%, and consumptive use coefficient for growing season K = 0.58, from the data below (assume leaching and pre-sowing requirement is zero, as not mentioned in the question).
Month
Mean monthly t (°C)
Monthly daylight (P, %)
Effective rainfall (cm)
Cu (cm)
Nov
18
7.2
2.6
6.72
Dec
15
7.15
2.8
6.12
Jan
13.5
7.30
3.5
5.95
Feb
14.5
7.10
2.0
5.98
Total
10.9
24.76
Each month's Cu computed via Cu = KP(1.8t + 32)/40 with K = 0.58 — e.g. Nov: 0.58×7.2×(1.8×18+32)/40 = 6.72 cm.
Assuming leaching and pre-sowing requirement is zero:
CIR = NIR = 13.86 cm · FIR = 21.32 cm · GIR = 30.46 cm